FULL REAR DORMER, FLAT ROOF LOFT CONVERSION. CREATING ONE BEDROOM WITH OPEN PLAN DRESSING ROOM AND EN-SUITE. LARGE UPVC WINDOW AND STAIRWELL WINDOW. TRIPLE VELUX MK04 SKY LIGHTS

1 of
Published on Video
Go to video
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Page 1 (0s)

FULL REAR DORMER, FLAT ROOF LOFT CONVERSION. CREATING ONE BEDROOM WITH OPEN PLAN DRESSING ROOM AND EN-SUITE. LARGE UPVC WINDOW AND STAIRWELL WINDOW. TRIPLE VELUX MK04 SKY LIGHTS.

Page 2 (14s)

YOUR PROJECT EXPLAINED PART ONE/ 4: PROJECT INCLUSIONS AND SPECS..

Page 3 (39s)

YOUR PROJECT EXPLAINED PART TWO/ 4 : PROJECT INCLUSIONS AND SPECS..

Page 4 (1m 7s)

YOUR PROJECT EXPLAINED PART THREE/ 4 : PROJECT INCLUSIONS AND SPECS..

Page 5 (1m 35s)

YOUR PROJECT EXPLAINED PART FOUR/ 4 : PROJECT INCLUSIONS AND SPECS..

Page 6 (2m 2s)

YOUR PROJECT EXPLAINED PLEASE READ PROJECT EXCLUSIONS.

Page 7 (2m 20s)

YOUR PROJECT EXPLAINED PROPOSED NEW FLOOR PLAN..

Page 8 (3m 3s)

YOUR PROJECT EXPLAINED PHASE 1 : PREPARATION & REGULATIONS.

Page 9 (3m 17s)

YOUR PROJECT EXPLAINED PHASE 2: REMOVE, SUPPORT & RE-STRUCTURE..

Page 10 (3m 34s)

YOUR PROJECT EXPLAINED PHASE 2: REMOVE, SUPPORT & RE-STRUCTURE..

Page 11 (3m 55s)

YOUR PROJECT EXPLAINED PHASE 3: INSULATION, INSPECTIONS AND FIRST FIXES.

Page 12 (4m 17s)

YOUR PROJECT EXPLAINED PHASE 3: INSULATION, INSPECTIONS AND FIRST FIXES.

Page 13 (4m 37s)

YOUR PROJECT EXPLAINED PHASE 4: SECOND FIXES, OUTDOOR COMPLETION AND FINAL TOUCHES.

Page 14 (5m 1s)

YOUR PROJECT EXPLAINED PHASE 5: FINAL INSPECTION, CERTIFICATION AND HANDOVER.

Page 15 (5m 20s)

YOUR PROJECT EXPLAINED TERMS AND CONDITIONS : PART ONE..

Page 16 (5m 46s)

YOUR PROJECT EXPLAINED TERMS AND CONDITIONS PART : TWO..

Page 17 (6m 20s)

YOUR PROJECT EXPLAINED PRICING AND PAYMENT CONDITIONS..

Page 18 (7m 0s)

YOUR PROJECT EXPLAINED HEALTH AND SAFETY.. Identify, assess and manage the health and safety risks arising from our work activities Consult with our contractors and seek their cooperation on matters affecting their health and safety. Provide and maintain safe plant and equipment Ensure safe handling and use of substances Provide instruction and supervision for all contractors Prevention of accidents and cases of work related ill health so far as reasonable predictable. Oversee the implementation and function of the safety management system, monitor and review on an annual basis..

Page 19 (7m 16s)

YOUR PROJECT EXPLAINED ENVIRONMENTAL OBLIGATIONS ..

Page 20 (7m 28s)

YOUR PROJECT EXPLAINED COVID 19 PROTECTIVE MEASURES..

Page 21 (7m 42s)

YOUR PROJECT PROPOSAL COMPLETE... Thank you for your time , we hope you are happy with your full length flat roof dormer loft conversion. Should you have any questions please do not hesitate to get in touch. PROPOSED TIME FRAME FOR WORKS: START END OF JANUARY COMPLETION EARLY APRIL LOOK UP LOFT CONVERSIONS..