FULL REAR DORMER, FLAT ROOF LOFT CONVERSION. CREATING ONE BEDROOM WITH OPEN PLAN DRESSING ROOM AND EN-SUITE. LARGE UPVC WINDOW AND STAIRWELL WINDOW. TRIPLE VELUX MK04 SKY LIGHTS

Published on Slideshow
Static slideshow
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Scene 1 (0s)

FULL REAR DORMER, FLAT ROOF LOFT CONVERSION. CREATING ONE BEDROOM WITH OPEN PLAN DRESSING ROOM AND EN-SUITE. LARGE UPVC WINDOW AND STAIRWELL WINDOW. TRIPLE VELUX MK04 SKY LIGHTS.

Scene 2 (14s)

YOUR PROJECT EXPLAINED PART ONE/ 4: PROJECT INCLUSIONS AND SPECS..

Scene 3 (39s)

YOUR PROJECT EXPLAINED PART TWO/ 4 : PROJECT INCLUSIONS AND SPECS..

Scene 4 (1m 7s)

YOUR PROJECT EXPLAINED PART THREE/ 4 : PROJECT INCLUSIONS AND SPECS..

Scene 5 (1m 35s)

YOUR PROJECT EXPLAINED PART FOUR/ 4 : PROJECT INCLUSIONS AND SPECS..

Scene 6 (2m 2s)

YOUR PROJECT EXPLAINED PLEASE READ PROJECT EXCLUSIONS.

Scene 7 (2m 20s)

YOUR PROJECT EXPLAINED PROPOSED NEW FLOOR PLAN..

Scene 8 (3m 3s)

YOUR PROJECT EXPLAINED PHASE 1 : PREPARATION & REGULATIONS.

Scene 9 (3m 17s)

YOUR PROJECT EXPLAINED PHASE 2: REMOVE, SUPPORT & RE-STRUCTURE..

Scene 10 (3m 34s)

YOUR PROJECT EXPLAINED PHASE 2: REMOVE, SUPPORT & RE-STRUCTURE..

Scene 11 (3m 55s)

YOUR PROJECT EXPLAINED PHASE 3: INSULATION, INSPECTIONS AND FIRST FIXES.

Scene 12 (4m 17s)

YOUR PROJECT EXPLAINED PHASE 3: INSULATION, INSPECTIONS AND FIRST FIXES.

Scene 13 (4m 37s)

YOUR PROJECT EXPLAINED PHASE 4: SECOND FIXES, OUTDOOR COMPLETION AND FINAL TOUCHES.

Scene 14 (5m 1s)

YOUR PROJECT EXPLAINED PHASE 5: FINAL INSPECTION, CERTIFICATION AND HANDOVER.

Scene 15 (5m 20s)

YOUR PROJECT EXPLAINED TERMS AND CONDITIONS : PART ONE..

Scene 16 (5m 46s)

YOUR PROJECT EXPLAINED TERMS AND CONDITIONS PART : TWO..

Scene 17 (6m 20s)

YOUR PROJECT EXPLAINED PRICING AND PAYMENT CONDITIONS..

Scene 18 (7m 0s)

YOUR PROJECT EXPLAINED HEALTH AND SAFETY.. Identify, assess and manage the health and safety risks arising from our work activities Consult with our contractors and seek their cooperation on matters affecting their health and safety. Provide and maintain safe plant and equipment Ensure safe handling and use of substances Provide instruction and supervision for all contractors Prevention of accidents and cases of work related ill health so far as reasonable predictable. Oversee the implementation and function of the safety management system, monitor and review on an annual basis..

Scene 19 (7m 16s)

YOUR PROJECT EXPLAINED ENVIRONMENTAL OBLIGATIONS ..

Scene 20 (7m 28s)

YOUR PROJECT EXPLAINED COVID 19 PROTECTIVE MEASURES..

Scene 21 (7m 42s)

YOUR PROJECT PROPOSAL COMPLETE... Thank you for your time , we hope you are happy with your full length flat roof dormer loft conversion. Should you have any questions please do not hesitate to get in touch. PROPOSED TIME FRAME FOR WORKS: START END OF JANUARY COMPLETION EARLY APRIL LOOK UP LOFT CONVERSIONS..