[Audio] QA/QC -203 Quality Control Reports in Construction Unit 13: 1 26 Pg:.

Scene 2 (9s)

[Audio] U-1-3 Quality Control Reports in Construction Objectives  Understand the concepts of quality control reports  Identify the different types of quality control reports .  Understand how to prepare the non conformance reports ( N-C-R-).

Scene 3 (31s)

[Audio] U-1-3 Quality Control Reports in Construction Quality Control Reports in Construction Projects Quality Control Reports in Construction Projects In construction, Quality Control (Q-C---) reports are essential documents that track and verify compliance with project specifications, industry standards, and contractual agreements. Detailed QC reports help project stakeholders identify, resolve, and prevent quality issues throughout the construction process. Below is a more comprehensive breakdown of QC reports and their components..

Scene 4 (1m 9s)

[Audio] U-1-3 Quality Control Reports in Construction Types of Construction Quality Reports Pre-Construction Quality Reports These reports establish the foundation for maintaining quality throughout the project by ensuring that all preparations are complete before the start of construction. Key elements include: Initial Material Submittals: Documentation and approval of materials, including certificates of compliance with standards (for example, concrete mix designs, steel certifications). Construction Method Statements: Detailed descriptions of how specific construction activities will be carried out, including equipment, procedures, and safety considerations..

Scene 5 (1m 54s)

[Audio] U-1-3 Quality Control Reports in Construction Types of Construction Quality Reports Pre-Construction Meeting Reports: Document agreements from the meeting between stakeholders (contractor, consultant, client) on quality expectations, hold points, and testing requirements. Site Readiness Inspections: Verifications that the site is ready for construction, including site clearing, utility relocations, and foundation preparations..

Scene 6 (2m 27s)

[Audio] U-1-3 Quality Control Reports in Construction Types of Construction Quality Reports Inspection and Approval Reports These reports are generated whenever a task is completed and inspected for compliance with quality standards and design requirements. Components include: Inspection Type: Describes the activity being inspected (for example, formwork, foundation, plumbing). Inspection Date and Time: Records when the inspection took place. Inspector Name and Signature: Identifies the inspector responsible for checking the work..

Scene 7 (3m 10s)

[Audio] U-1-3 Quality Control Reports in Construction Types of Construction Quality Reports Compliance Status: Whether the inspected work meets project specifications. Deficiencies Found: Lists any problems or deviations, including details on the exact nature of the non-compliance. Approval to Proceed: Documentation of approval if the inspected work meets the required standards, allowing the next stage to begin..

Scene 8 (3m 38s)

[Audio] U-1-3 Quality Control Reports in Construction Types of Construction Quality Reports Daily Quality Control Reports These are the most frequent type of report, prepared by quality inspectors, site engineers, or quality control managers to document day-to-day activities and quality checks. They typically include: Work Summary: A concise description of work performed on-site, including tasks, locations, and teams involved..

Scene 9 (4m 9s)

[Audio] U-1-3 Quality Control Reports in Construction Types of Construction Quality Reports Material Inspections: Material Received: Details on materials delivered, including supplier name, material type, batch number, and quantity. Material Compliance: Verification of materials against project specifications or approved submittals. Test Results: Preliminary or on-site tests, such as moisture content, temperature of concrete, or grading of aggregates..

Scene 10 (4m 46s)

[Audio] U-1-3 Quality Control Reports in Construction Types of Construction Quality Reports Work Inspections: Inspection of Completed Work: Activities inspected during the day (for example, concrete pouring, formwork installation). Visual Inspection Results: Checks for compliance with workmanship standards. Hold Points: Critical stages of construction that require inspection before proceeding..

Scene 11 (5m 16s)

[Audio] U-1-3 Quality Control Reports in Construction Types of Construction Quality Reports Testing and Measurements: Field Tests Performed: Records of tests like slump tests, compaction tests, or concrete cylinder strength tests. Sample Collection: Information on materials sampled for lab testing (for example, concrete cubes, soil samples). Test Equipment: Identification of equipment used (for example, concrete slump test cone, soil compaction tester)..

Scene 12 (5m 50s)

[Audio] U-1-3 Quality Control Reports in Construction Types of Construction Quality Reports Non-Conformance Report (N-C-R--) Log: Details of any defects or deviations from standards observed and documented. Weather Conditions: Daily weather conditions affecting work, especially for activities like concrete pouring. Manpower and Equipment Used: Listing of personnel and equipment on-site, which could influence QC. Photographic Evidence: Images of work done, equipment, or defects detected. Signatures: Signed by the quality inspector and other relevant personnel (for example, contractor, consultant, project manager)..

Scene 13 (6m 36s)

[Audio] U-1-3 Quality Control Reports in Construction Non-Conformance Reports (N-C-R--) Non-conformance reports are critical for documenting work or materials that fail to meet project standards or specifications. An N-C-R typically includes: Date and Time of Non-Conformance: When the issue was identified. Description of Non-Conformance: Detailed account of the problem, such as material defects, improper installation, or deviations from the design. Reference to Standards/Specifications: The specific section of the project specifications or standards that was violated..

Scene 14 (7m 14s)

[Audio] U-1-3 Quality Control Reports in Construction Non-Conformance Reports (N-C-R--) Photos/Drawings: Visual evidence of the non-conformance. Cause of Non-Conformance: Analysis of why the defect occurred (for example, improper handling, faulty materials, or human error). Corrective Action: Steps taken to rectify the issue, such as rework or replacing defective materials. Preventive Action: Measures implemented to prevent recurrence of the issue (for example, additional training, improved procedures). Approval and Closeout: Documentation that the issue was resolved and accepted by the project's quality manager or client representative..

Scene 15 (8m 4s)

[Audio] U-1-3 Quality Control Reports in Construction Test Reports Test Reports Test reports document the results of specific quality tests conducted on materials or completed work. These tests ensure compliance with standards such as ASTM, BS, or AASHTO. Typical test reports may include: Test Date and Location: When and where the test was conducted. Test Method: The standard or procedure used for the test (for example, ASTM C39 for concrete compressive strength). Test Results: Concrete Compression Test: Results from concrete strength tests at specified intervals (for example, 7-day, 28-day strength)..

Scene 16 (8m 59s)

[Audio] U-1-3 Quality Control Reports in Construction Types Construction Quality Reports Asphalt Tests: Results such as bitumen content, aggregate gradation, and Marshall stability. Soil Compaction Tests: Reports on soil density and moisture content. Rebar Tensile Test: Strength and elongation properties of reinforcing bars. Pass/Fail Status: Whether the material or work passed the required test criteria. Attachments: Graphs, charts, or tables showing test data and trends..

Scene 17 (9m 41s)

[Audio] U-1-3 Quality Control Reports in Construction Inspection and Test Plan (I-T-P--) Reports An I-T-P report outlines all the inspections and tests that need to be performed during the project. It ensures that work is done according to quality control procedures and project specifications. Components include: Activity or Work Description: The task being inspected (for example, formwork installation, rebar placement). Inspection Points: Details of the inspections to be conducted at various stages (for example, before concrete pour, after rebar placement). Test Requirements: Which tests need to be performed (for example, concrete slump test, asphalt density test)..

Scene 18 (10m 30s)

[Audio] U-1-3 Quality Control Reports in Construction Inspection and Test Plan (I-T-P--) Reports Acceptance Criteria: The standard or specification the work must meet to pass inspection. Hold and Witness Points: Critical stages where work cannot proceed without the client or inspector's approval. Responsible Parties: Who is responsible for carrying out the inspections and tests (for example, site engineer, QA/QC manager). Sign-Offs and Comments: Signatures from inspectors and stakeholders confirming that inspections and tests were conducted and approved..

Scene 19 (11m 9s)

[Audio] U-1-3 Quality Control Reports in Construction Final Quality Control Report (Close-Out Report) This report is generated at the end of a project or phase, summarizing all quality control activities, tests, and inspections conducted throughout the project lifecycle. It includes: As-Built Drawings: Drawings reflecting the final construction with any changes from the original design. Test Records: Compilation of all test results performed during the project. Material Certifications: Certificates verifying that materials used (for example, steel, concrete, aggregates) met the required standards. N-C-R Log and Close-Out: List of all N-C-Rs raised during the project and evidence that they were resolved. Client Approval: Confirmation from the client or their representative that the project was completed to their satisfaction and in compliance with the contract..

Scene 20 (12m 10s)

[Audio] U-1-3 Quality Control Reports in Construction Additional Features of Quality Control Reports Quality Dashboards and K-P-Is Modern QC systems often include dashboards to track Key Performance Indicators (KPIs) such as: Rate of N-C-Rs per month: Measures the frequency of defects. Average resolution time for N-C-R-s-: Tracks how quickly issues are addressed. Test pass rate: The percentage of tests passed versus total tests conducted..

Scene 21 (12m 47s)

[Audio] U-1-3 Quality Control Reports in Construction Additional Features of Quality Control Reports Submittal approval time: Measures how quickly material and work method submittals are approved. Quality Audits and Reporting In addition to daily and test reports, periodic quality audits are conducted to ensure that the project complies with the established quality management system (Q-M-S--). The audits check adherence to: ISO 9001 or other relevant quality standards. Company's internal quality procedures. Audit reports identify systemic issues, areas for improvement, and corrective actions needed to enhance quality outcomes..

Scene 22 (13m 30s)

[Audio] U-1-3 Quality Control Reports in Construction Additional Features of Quality Control Reports Photographic Reports Some projects include detailed photographic reports documenting: Before and after photos of critical activities. Progress photos showing stages of work. Defect documentation to highlight non-conformances..

Scene 23 (13m 55s)

[Audio] U-1-3 Quality Control Reports in Construction Challenges and Best Practices in QC Reporting Timely Reporting: Ensuring reports are produced and submitted on time is critical for addressing issues quickly. Consistency: Reports must be uniform and follow a standard format to ensure that nothing is missed. Data Integration: Using digital systems (for example, QC software) to integrate and automate report generation helps reduce manual errors and streamline communication. Communication: Clear communication between site teams, contractors, consultants, and clients is key to resolving non-conformances and maintaining quality..

Scene 24 (14m 37s)

[Audio] U-1-3 Quality Control Reports in Construction Summary  In construction, Quality Control (Q-C---) reports are essential documents that track and verify compliance with project specifications, industry standards, and contractual agreements.  Pre-Construction Quality Reports.: These reports establish the foundation for maintaining quality throughout the project by ensuring that all preparations are complete before the start of construction.  Inspection and Approval Reports : These reports are generated whenever a task is completed and inspected for compliance with quality standards and design requirements.

Scene 25 (15m 20s)

[Audio] U-1-3 Quality Control Reports in Construction Summary  Daily Quality Control Reports : These are the most frequent type of report, prepared by quality inspectors, site engineers, or quality control managers to document day-to-day activities and quality checks.  Non-conformance reports : Details of any defects or deviations from standards observed and documented and critical for documenting work or materials that fail to meet project standards or specifications.  Final Quality Control Report (Close-Out Report) : This report is generated at the end of a project or phase, summarizing all quality control activities, tests, and inspections conducted throughout the project lifecycle..

Scene 26 (16m 7s)

[Audio] U-1-3 Quality Control Reports in Construction Summary  Inspection and Test Plan (I-T-P--) Reports outlines all the inspections and tests that need to be performed during the project. It ensures that work is done according to quality control procedures and project specifications..