Scene 1 (0s)

[Audio] Site Specific Briefing UCL – Institute of Education (IOE) PHASE 2.

Scene 2 (9s)

[Audio] What we cover. About this Project The Overbury Team Our Working Area MSite Welfare Arrangements Safety Risk Controls Emergency Arrangements Site Rules Asbestos CCS Discipline.

Scene 3 (39s)

[Audio] Before we start You must complete the Overbury Online Induction before coming to site. You must have the correct CSCS card for your trade and it must be in date. You must have completed asbestos awareness training and provide a training record..

Scene 4 (58s)

[Audio] PROJECT DETAILS Our client is the Institute of Education (IOE) part of University College London. Our works form part of the Phase 2 Masterplan redevelopment plans for UCL. The project consists of the refurbishment of the main reception area and central staircase as well as Cores A&B with new MEP infrastructure throughout the cores and Plantrooms. We will also be undertaking the refurbishment of the Core A "wings and nibs" levels 9 to 5 and the Woburn restack project Zone C Levels 5, 6&9. The works in general will provide a number of large, flexible teaching, office and social learning areas as well as new WC facilities throughout Cores A&B..

Scene 5 (1m 46s)

[Audio] OVERBURY PROJECT TEAM Andrew Hill senior Project Manager First Aider & Fire Marshall Luke Bassett (Core Lobby Areas & Toilets) Project Manager Fire Marshall Leo Emmett (Pavilion, Reception & Logistics Hub) Site Manager Dean Howe (Risers and Plant Rooms) Site Manager First Aider & Fire Marshall.

Scene 6 (2m 24s)

[Audio] OVERBURY PROJECT TEAM Mick Lothian Technical Services Manager Ilar Dauti Project Manager Fire Marshall Bogdan Dumitru Structural Manager First Aider Sid Oliveira Logistics Manager First Aider & Fire Marshall.

Scene 7 (2m 55s)

[Audio] OVERBURY PROJECT TEAM Ioan Fiti Site Supervisor First Aider & Fire Marshall Charlie Davis Information Manager First Aider & Fire Marshall Mo Bedri Assistant Information Manager.

Scene 8 (3m 21s)

[Audio] Site Logistics Plan. © 2015 Overbury. Site Logistics Plan.

Scene 9 (3m 30s)

[Audio] Look straight at the camera one operative at a time!.

Scene 10 (3m 39s)

© 201 5 O verbu r y 12. will be the of tre perscoat data you provide, We coøect oasic o«sona data and special category pcrsor•al data. n form of health informaticn and biometrz data næd this infcrmation to ft-if' our Principal Contractor role to ensure YOJI heath and safety. We also check that vvcvkers the SOIS and reev•ant irductjons required for their IObs as as takJng steps to prevent unauthortsed access to our Ste, use V&te. fram Humm Recognitc•n Systems. a Cy•ber Essentials certified ctxncøny usirg tso 27001 certhed hcstjng to ensure data is safe and secure AJI the personal t%ta we collect is mocessed in the 0K. NO 3rd parties have access to personal datz unless the law thern to do so and aporoociate safeguards have been put in Place to keep your data safe. MSite forms part of Overbury ccmpany stantSrcjs and is mandatory on every preect for to fulfil mr role as Prircioä Cont.rÜ:y. Failure to with Msite regydng gve-ervolrnent Site access w0 m•tvbit Site opeatj'.es from workrg our sites. Should you have any concerts chase ernail:.

Scene 11 (3m 48s)

[Audio] CCTV is monitoring the MSite checkpoints please enter the gate one operative at a time..

Scene 12 (3m 57s)

[Audio] SITE LOGISTICS Access/egress for people is via the Service Road at Thornhaugh Street The site is open from 7:30am to 6pm Deliveries booked in via UCL Logistics (complete form) Materials and equipment are to be dropped off in the service road and taken to the Overbury site demise Storage for materials to be agreed with Overbury Management prior to delivery No parking on site.

Scene 13 (4m 31s)

[Audio] WELFARE The Site office is located on L3 Core A (Clarke Hall) Operatives welfare (Changing Room, Canteen & Toilets) are located in cabins to the rear of Woburn Square Smoking is not permitted on site including e cigarettes and we ask you not to smoke within the boundaries of the UCL Campus. The smoking area is located within the Cabins demise Battery charging station are located in the changing room within the welfare area PLEASE ASSIST US IN KEEPING FACILITIES CLEAN AND TIDY.

Scene 14 (5m 10s)

[Audio] NOISE RESTRICTIONS There are noise restrictions on the Project Noisy works are only allowed before 9am, between the hours of 1pm-2pm and after 5pm. The campus is a live university environment, so please consider all operatives when carrying out any noisy works. In addition audio equipment radios or use of headphones are not permitted on site..

Scene 15 (5m 39s)

© 201 5 O verbu r y 11. We will keep you up to date on the relevant hazards as and when they arise during the course of the project. A list will be displayed on the information boards and signage will be clearly in place..

Scene 16 (5m 48s)

[Audio] SITE INFORMATION BOARDS See site H&S notice board for project fire plan drawings indicating fire exit routes, fire extinguishers locations and muster areas..

Scene 17 (6m 1s)

[Audio] All Overbury PM's All Overbury SM's All Overbury site foremen.

Scene 18 (6m 10s)

[Audio] SITE RULES You must review asbestos registers before starting any works. This will be done with your supervisor a copy can be found in the office if required. Please respect staff and students Watch your language! Remember you are representing your company and Overbury.

Scene 19 (6m 34s)

© 201 5 O verbu r y 16. You must read and understand if you had not done so already your Risk Assessments and any necessary Method Statements You will be required to signed to confirm you have read and understood Permits are required for the following areas / Activities; Hot works Confined Spaces Access to Risers Access to areas outside of site boundary Use of steps (with specific Risk Assessments.

Scene 20 (6m 43s)

[Audio] MINIMUM PPE REQUIREMENTS FOR THIS SITE Safety helmets to BS EN397 (Bump Caps are not acceptable) Safety footwear with reinforced toe caps and mid sole reinforcement to BS EN345 High visibility vests to BS EN471 Suitable hand protection in the form of Safety Gloves (to a minimum of BS4343 EN345).

Scene 21 (7m 16s)

[Audio] Additional PPE Depending on your task and approved method statement you may be required to wear additional PPE: Eye Protection such as goggles or full face visors Wrist and Arm protection (gauntlets or wristlets), working in ceiling voids Ear protection (ear defenders/plugs) Respiratory protection (face masks), wood working, rubbing down, COSHH Fall protection (harness with fall restraint or Fall arrest lanyards) Overalls.

Scene 22 (7m 55s)

[Audio] EMERGENCY PROCEDURES In the event of fire the alarm; Proceed to the assembly point at the top of the service road opposite the SOAS Brunei Building via the fire routes shown on the Site plan. Overbury Management will run through roll call. Only return back onto site once instructed by Overbury Management Following this induction please take the time to familiarise yourself with routes and exits. Fire marshals on this project are Dean Howe, Luke Bassett and Sid Oliveira All the above information is also displayed on the site notice board which is located the site entrance..

Scene 23 (8m 38s)

[Audio] INCIDENTS/ACCIDENTS All incidents must be reported to Overbury Site Management immediately this includes: When anyone has been injured not matter how small Any near misses, this is anything that could have resulted in an accident Ensure any injuries are entered into the accident book which is kept in the site office The First Aiders for this project are: Luke Bassett Dean Howe Sid Oliveria.

Scene 24 (9m 13s)

[Audio] The Nearest Hospital to the Site is University College Hospital 0.4 miles Tel: 020 3456 7890 University College Hospital 235 Euston Road London NW1 2BU Open 24 Hours a day.

Scene 25 (9m 44s)

© 201 5 O verbu r y 26. Directions to Hospital are :.

Scene 26 (9m 53s)

[Audio] HOUSEKEEPING Materials to be stored on racking or pallets in the dedicated areas Do not block access routes or fire exits Clear up any waste generated as you go Be respectful of other trades work on site When moving materials or equipment around the site. Loads on A frame trollies to be secured with straps when moving. Arrange for materials in your way to be moved rather than 'making do'.

Scene 27 (10m 25s)

[Audio] ENVIRONMENTAL MANAGEMENT Overbury is committed to recycling don't waste materials. Re-use where possible Always place your waste in the correct bin which are signed as displayed. Don't forget to check to see if it needs to go in hazardous waste bin We also provide spill kits on the floor next to the fire pints.

Scene 28 (10m 50s)

[Audio] ASBESTOS A refurbishment/demolition survey has been carried out: By Lucion on behalf of UCL. This can be found in the Site Office. All operatives must have attended an asbestos awareness course to be allowed to work on this site and provide a in date training record..

Scene 29 (11m 12s)

[Audio] Areas in the building where you can expect to find ACM's; Packing to door frames Movement Joints to walls – Woven materials.

Scene 30 (11m 24s)

[Audio] Gasket to existing ductwork Electrical cupboards - AIB.

Scene 31 (11m 33s)

[Audio] Existing Door Cores Existing Overhead door panels.

Scene 32 (11m 42s)

[Audio] Tops of existing blockwork walls – Woven Rope Tops of existing blockwork walls – Woven Rope.

Scene 33 (11m 52s)

© 201 5 O verbu r y 34. However should you come across any material that you suspect as containing asbestos Stop work immediately make sure the area is secure. Report to Overbury Site Management Uncontrolled Asbestos Disturbance: If previously identified/ newly identified ACM is disturbed all work should cease immediately and the OPERATIVE(S) SHOULD GO TO THE CLOSEST SAFE PLACE. DO NOT MOVE FROM THAT SAFE PLACE. If suspect ACM has been disturbed, contact y our site supervisor who will contact the Overbury Site Management team, who will assist with evacuation of the area and prevent anyone from entering if possible i.e. by fencing off the area, locking doors to rooms, displaying signage etc. Special consideration must be given to ACM disturbed in open riser shafts, Plant rooms (Tops of blockwork walls) , air inlet shafts, ventilation ducts & shafts, etc. together with the management measures that must be adopted to control a potential fibre release in these work areas. Those potentially exposed should move away from the immediate area containing the suspected ACM, but DO NOT go straight to the site office/ welfare area where they could spread potential contamination. Instead they should move a minimum distance of 5m away from the discovery and where possible, remain in the work area. 5. Overbury will follow company Policy in dealing with incident..

Scene 34 (12m 1s)

Discovered materials that could contain asbestos? Stop work immediately! Keep everyone else out of the area Report the problem to the person in charge as soon as possible Put up a warning sign 'Possible asbestos contamination' Damaged materials that could contain asbestos? Stop work immediately! Is there dust Or debris on clothing? Arrange a sample OR to be analysed Does it contain NO YES presume it contains the worst type of asbestos Apply the appropriate controls, using a Contractor if i red Update the asbestos management plan A little, eg dust on sleeves/ shoes Wipe down with damp rags NO action required A lot, eg contaminated clothes, hair, footwear Stay put, avoid inhaling dust. put on RPE if possible, damp Wipe outer clothing if possible, then remove outer clothing before moving away from source. Seek help. Helper to put on PPE and RPE before entering area Damp wipe all contaminated items: clothing (as necessary), footwear and skin/hair until visually clean. Decide if need to wash hair and shower Put contaminated clothes, towels etc in a plastic bag and dispose of as asbestos waste Dispose of rags as asbestos waste and keep a record of the event Decide if the work needs a licensed contractor.

Scene 35 (12m 10s)

[Audio] OPEN DOOR POLICY If you feel that what you are being asked to do is unsafe tell your supervisor. If you are still unsure, then ask us Please report anything you feel is unsafe or potentially unsafe..

Scene 36 (12m 28s)

© 201 5 O verbu r y 35. As the main point of contact for health and safety representing your firm You will be required to: Carry out MS/RA briefings, copies of which will have to be issued to Overbury and ensure that operatives are following them Carry out weekly tool box talks and issue signed registers to Overbury Ensure all your operatives have the correct PPE before they start work Ensure all your operatives follow the Overbury site rules Be a first aider or have appropriate cover within your team.

Scene 37 (12m 37s)

© 201 5 O verbu r y 36. Signage Colours.

Scene 38 (12m 46s)

[Audio] CONSIDERATE CONSTRUCTORS SCHEME This Site is registered with the Considerate Constructors Scheme. The main characteristics of the scheme are: Code of Considerate Practice Care about Appearance Respect the Community Protect the Environment Secure everyone's Safety Value their Workforce.

Scene 39 (13m 6s)

[Audio] Working together we can create a safe site for us all Look out for your colleagues Comply, Intervene & Respect….Continuous Improvement.