TECHNICAL SERVICES DEPARTMENT HIGHLIGHT ACCOMPLISHMENTS FOR THE YEAR 2024.

Scene 2 (8s)

1ST QUARTER.

Scene 3 (14s)

INSTALLATION OF SCADA SYSTEM.

Scene 4 (21s)

INSTALLATION OF RECLOSER TIPAZ OFFICE. kid). Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 5 (30s)

INSTALLATION OF LINE RECLOSER MANIKI KAPALONG, CROSSING VILLA CLEMENTA.

Scene 6 (40s)

RETRIEVAL OF POLES SAWATA, SAN ISIDRO, DDN. •svsél]l.

Scene 7 (52s)

CONDUCT LINE RECONDUTORING IGANGON SAN ISIDRO TO LOGDECK.

Scene 8 (1m 3s)

CONSTRUCTION OF LIBRA CONTROL ROOM ANISLAGAN, MACO INSTALLATION OF CHARGER FOR 69KV RELAY PANTUKAN SUBSTATION.

Scene 9 (1m 14s)

INSTALLATION OF METERING FOR SAMAL CONNECTION LOOBAN SUBSTATION LOAD BALANCING OF FEEDER 151 AND FEEDER 152 FOR POWER QUALITY WITH THE HELP OF AREA 3 LINEMEN.

Scene 10 (1m 27s)

INSTALLATION OF LINE RECLOSER KINGKING PANTUKAN AVR ISOLATION MAGNAGA PANTUKAN, DDO.

Scene 11 (1m 38s)

Activity Installation of Feeder Metering (DMC Compliance) Conduct load evaluation on voltage quality complaint on HV Consumers Inspection of High Voltage Consumer Metering Reclassification form Low Voltage to High Voltage HV Consumers for kwhr meter check up Replacement of defective HV KWH meters Conduct regular analysis on 3-phase monthly Energy, Demand and Multipliers Upgrading of High Voltage Metering Connections Endorsement of suspected pilferers to ARRS Energization of High Voltage Applicants Meter Calibration (New) Meter Re-calibration and Repair on field Metering Equipment Testing Recallibration of KWH meters for ERC Compliance INSPECTION OF HV APPLICANT (CLEARANCE) REQUEST FOR STAKING REQUEST FOR COST ESTIMATE JAN 118 5 22 5 3 1 1 15 40 26 31 FEB 3 163 8 9 8 3 5 1 35 43 38 25 MARCH 3 3 331 5 8 27 3 6 3 23 1,310 130 30 300 35 59 31 TOTAL 3 6 612 18 39 40 9 12 5 73 1,310 130 30 300 118 123 87.

Scene 12 (2m 5s)

[Audio] 1ST QUARTER. 2ND QUARTER.

Scene 13 (2m 11s)

SYNCHRONIZATION OF NEWLY INSTALLED GENSET MGC IGACOS.

Scene 14 (2m 20s)

PARTIAL INSTALLATION OF SCADA CONTROLS APOKON AND CANOCOTAN SUBSTATION.

Scene 15 (2m 29s)

INSTALLATION OF RECLOSER BIG 8 AND 3RD AVENUE. SECDEA.

Scene 16 (2m 38s)

LOAD BALANCING AND PHASE TAGGING FEEDER 145 AND FEEDER 142.

Scene 17 (2m 49s)

INSTALLATION OF ANTENNA FOR SCADA APOKON SUBSTATION AND MIRAFUENTES SUBSTATION.

Scene 18 (2m 59s)

RECONDUCTORING OF FEEDER 133. UROK MAGUGPO. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 19 (3m 7s)

CONDUCT POWER TRANSFORMER OIL DGA TESTING DASURECO.

Scene 20 (3m 15s)

FINAL ASBUILT FOR SITIO ELECTRICATION PROGRAM DCLA TAMBO BABAK, SWEET HONEY DEL MONTE, P4 CABANBANAN SAN ANTONIO, P7 DULIAN SAN ANTONIO, P1-P6 TAGBAY, P4 TAGBAY , P-3 PIGASAAN TAGBAY , PRK. IPIL- IPIL SAN REMEGIO SAMAL.

Scene 21 (3m 32s)

M6 POWER TRANSFORMER OIL LEAK FIXING. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 22 (3m 40s)

COMPREHENSIVE TESTING , OIL FILTERING , AND DEGASIFYING OF M1 AND M9 AS PART OF RIDE-ON SUBSTATION PREVENTIVE MAINTENANCE.

Scene 23 (3m 52s)

F142 LOAD BALANCING. 19 VX Od. poco 'GT'. OOOd. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 24 (4m 1s)

CANOCOTAN SUBSTATION PMES AND NGCP TAGGING. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 25 (4m 9s)

APOKON SUBSTATION DEGASSING AND OIL FILTERING. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 26 (4m 18s)

INSTALLATION OF LINE RECLOSER TANDAWAN AND CAMBAGANG.

Scene 27 (4m 26s)

M6 MONTEVISTA SS PMS. M6AR-F63. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 28 (4m 35s)

Activity Installation of Feeder Metering (DMC Compliance) Conduct load evaluation on voltage quality complaint on HV Consumers Inspection of High Voltage Consumer Metering Reclassification form Low Voltage to High Voltage HV Consumers for kwhr meter check up Replacement of defective HV KWH meters Conduct regular analysis on 3-phase monthly Energy, Demand and Multipliers Upgrading of High Voltage Metering Connections Endorsement of suspected pilferers to ARRS Energization of High Voltage Applicants Meter Calibration (New) Meter Re-calibration and Repair on field Metering Equipment Testing Recallibration of KWH meters for ERC Compliance INSPECTION OF HV APPLICANT (CLEARANCE) REQUEST FOR STAKING REQUEST FOR COST ESTIMATE APRIL 1 2 597 13 9 10 6 5 6 12 46 56 29 MAY 1 3 528 7 4 29 2 8 2 42 84 72 43 JUNE 1 5 435 12 12 24 3 9 12 41 8,855 120 30 300 58 71 37 TOTAL 3 10 1,560 32 25 63 11 22 20 95 8,855 120 30 300 188 199 109.

Scene 29 (5m 1s)

[Audio] 1ST QUARTER. 3RD QUARTER.

Scene 30 (5m 7s)

INSTALLATION OF 167 KVAR AVR KALIGUTAN, LAAK. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 31 (5m 17s)

REPLACEMENT OF BYPASS DISCONNECTION SWITCH SAN JUAN MESAOY, NEW CORELLA.

Scene 32 (5m 26s)

REPLACEMENT OF CT-PT OF 69KV PROTECTION OF M5 NABUNTURAN SUBSTATION HOTSPOT CORRECTION M5 SUBSTATION PREVENTIVE MAINTENANCE M11 PREVENTIVE MAINTENANCE INSTALLATION OF NEW LINE (PARALLEL LINE) GOING MUNICIPALITY KAPALONG RECONDUCTORING OF WIRE FROM 2/0 TO 4/0 WIRE OF FEEDER 52 - NEW SIBONGA TO POBLACION NABUNTURAN.

Scene 33 (5m 47s)

2-DAY SCADA SEMINAR CONDUCTED BY PPI.

Scene 34 (5m 54s)

PVM-SHS TEAM AT SITIO TAMBIS, BRGY. MABUGNAO, MAGRAGUSAN.

Scene 35 (6m 4s)

REMOVAL OF 3 UNITS OF AVR PANTUKAN. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 36 (6m 12s)

OIL FILTRATION, DEGASIFICATION AND DGA TESTING MONKAYO SUBSTATION.

Scene 37 (6m 21s)

AREA 2 AND AREA 3 LUSONG RECONDUCTORING 3-PHASE LINE ALONG MARY’S WOOD - HEXAT LINE, PANDAPAN ASSISTED BY TSD.

Scene 38 (6m 32s)

OIL FILTRATION, DEGASIFICATION AND DGA TESTING MACO SUBSTATION.

Scene 39 (6m 41s)

LOAD BALANCING FEEDER 21 AND FEEDER 23. nuo. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 40 (6m 50s)

M2-MACO SUBSTATION PMS. L.z•-80ZLN .94.. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 41 (7m 0s)

OIL FILTRATION, DEGASIFICATION AND DGA TESTING MIPANGI SUBSTATION.

Scene 42 (7m 9s)

OIL FILTRATION, DEGASIFICATION AND DGA TESTING CANOCOTAN SUBSTATION.

Scene 43 (7m 18s)

CONSTRUCTION OF POWERHOUSE TIPAZ OFFICE. Avir.-s.

Scene 44 (7m 27s)

TRANSFORMER PAD CONCRETING MIRAFUENTES SUBSTATION.

Scene 45 (7m 37s)

M5-NABUNTURAN 69KV DISCONNECTION SWITCH RE-ALIGNMENT, POST INSULATOR CLEANING & TIGHTENING.

Scene 46 (7m 46s)

M6- MONTEVISTA REGASKETING AND SUBSTATION PMS. 9..

Scene 47 (7m 55s)

REPLACEMENT OF LINE RECLOSER NUEVO ILOCO, MAWAB. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 48 (8m 4s)

Activity Installation of Feeder Metering (DMC Compliance) Conduct load evaluation on voltage quality complaint on HV Consumers Inspection of High Voltage Consumer Metering Reclassification form Low Voltage to High Voltage HV Consumers for kwhr meter check up Replacement of defective HV KWH meters Conduct regular analysis on 3-phase monthly Energy, Demand and Multipliers Upgrading of High Voltage Metering Connections Endorsement of suspected pilferers to ARRS Energization of High Voltage Applicants Meter Calibration (New) Meter Re-calibration and Repair on field Metering Equipment Testing Recallibration of KWH meters for ERC Compliance INSPECTION OF HV APPLICANT (CLEARANCE) REQUEST FOR STAKING REQUEST FOR COST ESTIMATE JULY 176 11 13 8 2 42 59 47 29 AUG 80 14 20 9 5 74 86 70 61 SEP 5 557 20 13 16 9 10 2 52 15,720 120 40 300 66 68 38 TOTAL 5 813 45 13 49 9 27 9 168 15,720 120 40 300 211 185 128.