TECHNICAL SERVICES DEPARTMENT HIGHLIGHT ACCOMPLISHMENTS FOR THE YEAR 2024.

Scene 2 (2s)

1ST QUARTER.

Scene 3 (8s)

INSTALLATION OF SCADA SYSTEM.

Scene 4 (15s)

INSTALLATION OF RECLOSER TIPAZ OFFICE. kid). Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 5 (24s)

INSTALLATION OF LINE RECLOSER MANIKI KAPALONG, CROSSING VILLA CLEMENTA.

Scene 6 (34s)

CONDUCT LINE RECONDUTORING AT IGANGON SAN ISIDRO TO LOGDECK RETRIEVAL OF POLES AT SAWATA, SAN ISIDRO, DDN.

Scene 7 (47s)

CONSTRUCTION OF LIBRA CONTROL ROOM ANISLAGAN, MACO INSTALLATION OF CHARGER FOR 69KV RELAY PANTUKAN SUBSTATION.

Scene 8 (59s)

INSTALLATION OF METERING FOR SAMAL CONNECTION LOOBAN SUBSTATION LOAD BALANCING OF FEEDER 151 AND FEEDER 152 FOR POWER QUALITY WITH THE HELP OF AREA 3 LINEMEN.

Scene 9 (1m 12s)

INSTALLATION OF LINE RECLOSER KINGKING PANTUKAN AVR ISOLATION MAGNAGA PANTUKAN, DDO.

Scene 10 (1m 23s)

2ND QUARTER.

Scene 11 (1m 29s)

SYNCHRONIZATION OF NEWLY INSTALLED GENSET MGC IGACOS.

Scene 12 (1m 38s)

INSTALLATION OF RECLOSER BIG 8 AND 3RD AVENUE. SECDEA.

Scene 13 (1m 47s)

LOAD BALANCING AND PHASE TAGGING FEEDER 145 AND FEEDER 142.

Scene 14 (1m 58s)

RECONDUCTORING OF FEEDER 133. UROK MAGUGPO. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 15 (2m 7s)

COMPREHENSIVE TESTING , OIL FILTERING , AND DEGASIFYING OF M1 AND M9 AS PART OF RIDE-ON SUBSTATION PREVENTIVE MAINTENANCE.

Scene 16 (2m 18s)

F142 LOAD BALANCING. 19 VX Od. poco 'GT'. OOOd. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 17 (2m 27s)

CANOCOTAN SUBSTATION PMES AND NGCP TAGGING. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 18 (2m 35s)

APOKON SUBSTATION DEGASSING AND OIL FILTERING. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 19 (2m 44s)

INSTALLATION OF LINE RECLOSER TANDAWAN AND CAMBAGANG.

Scene 20 (2m 52s)

M6 MONTEVISTA SS PMS. M6AR-F63. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 21 (3m 1s)

3RD QUARTER.

Scene 22 (3m 7s)

INSTALLATION OF 167 KVAR AVR KALIGUTAN, LAAK. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 23 (3m 17s)

REPLACEMENT OF BYPASS DISCONNECTION SWITCH SAN JUAN MESAOY, NEW CORELLA.

Scene 24 (3m 26s)

REPLACEMENT OF CT-PT OF 69KV PROTECTION OF M5 NABUNTURAN SUBSTATION HOTSPOT CORRECTION M5 SUBSTATION PREVENTIVE MAINTENANCE M11 PREVENTIVE MAINTENANCE INSTALLATION OF NEW LINE (PARALLEL LINE) GOING MUNICIPALITY KAPALONG RECONDUCTORING OF WIRE FROM 2/0 TO 4/0 WIRE OF FEEDER 52 - NEW SIBONGA TO POBLACION NABUNTURAN.

Scene 25 (3m 47s)

PVM-SHS TEAM AT SITIO TAMBIS, BRGY. MABUGNAO, MAGRAGUSAN.

Scene 26 (3m 56s)

OIL FILTRATION, DEGASIFICATION AND DGA TESTING MONKAYO SUBSTATION.

Scene 27 (4m 5s)

AREA 2 AND AREA 3 LUSONG RECONDUCTORING 3-PHASE LINE ALONG MARY’S WOOD - HEXAT LINE, PANDAPAN ASSISTED BY TSD.

Scene 28 (4m 16s)

OIL FILTRATION, DEGASIFICATION AND DGA TESTING MACO SUBSTATION.

Scene 29 (4m 26s)

LOAD BALANCING FEEDER 21 AND FEEDER 23. nuo. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 30 (4m 34s)

M2-MACO SUBSTATION PMS. L.z•-80ZLN .94.. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 31 (4m 44s)

OIL FILTRATION, DEGASIFICATION AND DGA TESTING MIPANGI SUBSTATION AND CANOCOTAN SUBSTATION.

Scene 32 (4m 54s)

TRANSFORMER PAD CONCRETING MIRAFUENTES SUBSTATION.

Scene 33 (5m 4s)

M5-NABUNTURAN 69KV DISCONNECTION SWITCH RE-ALIGNMENT, POST INSULATOR CLEANING & TIGHTENING.

Scene 34 (5m 13s)

M6- MONTEVISTA REGASKETING AND SUBSTATION PMS. 9..

Scene 35 (5m 22s)

REPLACEMENT OF LINE RECLOSER NUEVO ILOCO, MAWAB. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 36 (5m 31s)

4TH QUARTER.

Scene 37 (5m 38s)

EMERGENCY PMS OF CANOCOTAN SUBSTATION. vdlbjdil\iø.

Scene 38 (5m 46s)

IGACOS LIGHT POWER COMPANY METERING EQUIPMENT REPLACEMENT.

Scene 39 (5m 54s)

INSTALLATION OF 69KV RELAY AND INSTALLATION OF FEEDER CURRENT TRANSFORMER FOR FEEDER METERING APOKON SUBSTATION.

Scene 40 (6m 4s)

REPLACEMENT OF RECLOSER MISA TAGUM. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 41 (6m 13s)

PMS MIRAFUENTES SUBSTATION. evz»:. ita. Pin Map PNG Transparent Images Free Download | Vector Files | Pngtree.

Scene 42 (6m 22s)

NCGP RIDE ON ACTIVITIES MACO SUBSTATION PMS. Open photo.

Scene 43 (6m 31s)

NGCP RIDE ON ACTIVITIES MABINI SUBSTATION – LINE RECLOSER JUMPERING.

Scene 44 (6m 41s)

APOKON SUBSTATION Installation of Feeder Metering.

Scene 45 (6m 51s)

ROW NEGOTIATIONS ASUCION-KAPALONG CAPEX LINE WITH MAYOR TIMBOL.

Scene 46 (7m 0s)

ATTEND NGCP OVERCURRENT PROTECTION RELAY TRAINING IN DAVAO CITY.

Scene 47 (7m 9s)

INSPECTION OF NEW INSTALLED TRANSFORMER FOR 500KVA GENERATOR TIPAZ OFFICE.

Scene 48 (7m 18s)

GOD BLESS & MORE POWER!.