Smart Grid Pilot Project Under DPDC. A journey towards Smart Bangladesh.
Project Implementation period:. Project Start Date Project Completion Date (extention will be needed) 01.07.2020 30.06.2025.
Component 1: (EUR 100 million) - Power Factor Improvement financed by AFD loan.
Objectives of Smart Grid in DPDC. ✔️ To improve the quality of power supply (power factor improvement) ✔️ To enhance the reliability of supply ✔️ To increase redundancy in the distribution network ✔️ To reduce system losses ✔️ To strengthen accountability and transparency ✔️ To enhance operational flexibility for efficient power distribution ✔️ To increase customer engagement ✔️ To align with the mission and vision of DPDC.
Expected Outcomes of Smart Grid Project. ✅ More stable and high-quality electricity supply ✅ Reduced power outages and improved service continuity ✅ Enhanced grid resilience with redundancy in the network ✅ Lower technical and non-technical losses ✅ Implementation of self-healing of Network through FLISR technology ✅ Improved customer satisfaction and interaction ✅ Strengthened governance with better accountability and transparency ✅ Achieving DPDC’s long-term mission of a modernized power system.
Prominent Housing Nabinagar Housing Ramchandrapur Road 6 Avenue Road 2 Society PC Culture Housing Society Muhammadia 00 mad Zia Uddan Lackpar Road Sanqshad Bhaban Lake anma Shaheenbag Nakhi Tejkuni Para Indira RD-—- - b gan.
line connector. line connector. line connector. line connector.
PRESENT OPERATIONAL PROCEDURE OF 11KV OVERHEAD FEEDERS.
Satmasjid 33/11 kV Substation. Asad Gate 33/11 kV Substation.
Satmasjid 33/11 kV Substation. Asad Gate 33/11 kV Substation.
SMART GRID: ADMS Functionality on 11KV Overhead Feeders.
Satmasjid 33/11 kV Substation. Asad Gate 33/11 kV Substation.
Satmasjid 33/11 kV Substation. Asad Gate 33/11 kV Substation.
Fault Occurs. Satmasjid 33/11 kV Substation. Asad Gate 33/11 kV Substation.
Satmasjid 33/11 kV Substation. Asad Gate 33/11 kV Substation.
Fault Occurs. Satmasjid 33/11 kV Substation. Asad Gate 33/11 kV Substation.
Satmasjid 33/11 kV Substation. Asad Gate 33/11 kV Substation.
Satmasjid 33/11 kV Substation. Asad Gate 33/11 kV Substation.