CURRENT ACTIVITIES. AS OF JANUARY 28, 2021.
PLUMBING.
INSTALLATION OF PLUMBING FIXTURE 4TH FLOOR.
2ND FLOOR. INSTALLED. WATER CLOSET. SHOWER FIXTURE.
3RD FLOOR. INSTALLED. WATER CLOSET. SHOWER FIXTURE.
4TH FLOOR. INSTALLED. WATER CLOSET. SHOWER FIXTURE.
TABULATION 2ND FLOOR. wc WATER CLOSET SHOWER FIXTURE FLOOR DRAIN FLOOR WL 203 UNIT 204 UNIT 205 UNIT 206 207 UNIT 208 209 210 UNIT 211 212 UNIT 213 UNIT 215 UNIT 217 218 219 UNIT 220 UNIT 221 UNIT 222 UNIT 22 225 226 wc 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K so LAV 0K 0K SHOWER DRAIN CLEANOUT LAVATORY SD 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K IAV 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K.
TABULATION 3RD FLOOR. wc WATER CLOSET SHOWER FIXTURE FLOOR DRAIN FLOOR LVI UNIT UNIT UNIT UNIT UNIT UNIT UNIT "NIT 312 UNIT UNIT 314 UNIT UNIT UNIT 'NIT 319 UNIT UNIT 322 UNIT UNIT 324 UNIT 325 UNIT SHOWER DRAIN CLEANOUT LAVATORY wc LAV 0K 0K.
TABULATION 4TH FLOOR. co LAV wc o o WATER CLOSET SHOWER FIXTURE FLOOR DRAIN FLOOR UNIT UNIT 404 UNIT 405 UNIT UNIT 407 UNIT 408 409 UNIT 410 UNIT UNIT 412 UNIT UNIT 414 UNIT 415 UNIT UNIT 417 UNIT UNIT 419 UNIT 420 UNIT 421 UNIT 422 UNIT 423 UNIT 424 UNIT 425 UNIT 426 SHOWER DRAIN CLEANOUT LAVATORY so 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K 0K co LAV.
FIRE PROTECTION.
RECTIFICATION OF FIRE PRO DROPPINGS @ BASEMENT 1 (COMMON TOILET).
REMAINING WORKS(PL/S). BASEMENT 3. BASEMENT 2. -INSTALLATION OF PLUMBING FIXTURES.
REMAINING WORKS(FP). BASEMENT 3. -ALL WORKS DONE.
3RD FLOOR. 4TH FLOOR. 5TH FLOOR. -FINAL DROPPINGS.
THANK YOU!.