POLICE REGIONAL OFFICE 13. REGIONAL SHELTER BOARD MEETING.
READING AND APPROVAL OF THE MINUTES OF THE PREVIOUS RSB MEETING DATED SEPTEMBER 18, 2025 PRO13 PNCO QUARTERING FACILITY WATER SUPPLY LINES AND DETAILED COST ESTIMATES 3. POLICIES AND GUIDELINES FOR PNCO QUARTERING FACILITY 4. PARAMETERS AND CHECKLIST FOR THE TURN-OVER OF PNCO QUARTERING FACILITY 5. OTHER MATTERS.
READING AND APPROVAL OF THE MINUTES OF THE PREVIOUS RSB MEETING DATED SEPTEMBER 18, 2025.
PRO13 PNCO CONDO WATER SUPPLY LINES AND DETAILED COST ESTIMATES.
[image].
2 INCHES DIAMETER. [image]. WATER LINE. [image].
2 INCHES DIAMETER. [image]. WATER LINE. [image].
2 INCHES DIAMETER. [image]. WATER PUMP. RISER. 2 INCHES DIAMETER.
[image]. BLUE LINE 5TH FLOOR. RED LINE 4TH FLOOR.
00"60,'. [image] —ii'ii—vii/äm. BLUE LINE 5TH FLOOR.
iii. ii. \ II \ I I i I I I I i I I i i i i i I i i i t i I I I I I II I.
DETAILED COST ESTIMATES – WATER CONNECTION. DETAILED COST ESTIMATES – WATER CONNECTION.
POLICIES AND GUIDELINES FOR PNCO QUARTERING FACILITY.
PNCO CONDO APPLICANTS. PNCO CONDO APPLICANTS. PNCO CONDO UNIT DESIGNATION.
PARAMETERS AND CHECKLIST FOR THE TURN-OVER OF PNCO QUARTERING UNITS.
OTHER MATTERS.
END OF PRESENTATION.
BCWD EXISTING PIPELINE. 4 INCHES PIPELINE DIAMETER.