Nepal Water Supply Corporation (NWSC). Butwal Water Supply Project (BWSP) Jhumsa Khola Source, Palpa – Butwal Sub-Metropolitan City Presentated by: Er.Mandeep Shrestha Project manager 2083/02/25.
Jhumsha Source(Mathagadhi,Jhadewa Bazar). ezeg emapeup aj€us upe6é1_41E-L.N S e 49peqr s " iup.
झुम्षा खोला मूल. झुम्षा खोला को मूल झडेवा बजार बाट सुरु हुन्छ वार्ड न. ३ र ५ को पनि सिमाना माताघडी गौपालिका र तिनाउ गौपालिका को सिमाना.
Intake Location.
Intake Structure.
Presentation Outline. Project Background & Location Project Phases Overview Procurement & Contract Status (Phase 1) Physical Infrastructure Progress (Dams, Pipelines, Bridges) Service Area Expansion (Ward No. 7 & 8) Land Acquisition Status Major Problems & Challenges Support Required from Ministry of Infrastructure Development.
Project Background & Location. Project Initiation: 2057 BS (Sisne Khola source, later changed to Jhumsa Khola, Palpa in ~2067 BS) Dam/Pipelaying DPR 2073/10/12-2073/11/27 Overall Concept Finalized: 2074 BS Budget First Allocated: FY 2074/2075 – ~1 Arab NPR Water Production Capacity: 32 MLD Service Area: Butwal Sub-Metropolitan City (except Ward 7 & 8 initially) Key Infrastructure: 20” & 10” DI pipes (parallel layout) Intake at Jhumsa Khola Treatment Plant, Reservoirs, Truss Bridges.
Project Initiated in F/Y 2075/076. Major Works were Divided in 4 Packages Package 1: Pipe & Fittings ( NRs. 211922907.00) b. Package 2: Diversion Structure ( Weir, Intake and Connection Pipe ) NRs. 141659063.15 c. Package 3: Pipe laying & Additional Fittings and Crossing Bridge NRs. 152498055.23 d. Package 4: Desander, Water Collection Chamber and Operation Building NRs. 37,607,556.75.
Project Cost & Phases. S.N Description Total Cost (NPR) 1 Main Project (4 Packages) 73,64,17,291.84 2 Ward 7 & 8 Addition Packages 28,32,78,828.36 Total Grand Total 1,01,96,96,120.20.