PowerPoint Presentation

Published on
Embed video
Share video
Ask about this video

Scene 1 (0s)

[Audio] WELCOME TO ARSHYA ENGINEERS AND FABRICATIONS PVT. LTD..

Scene 2 (10s)

[Audio] INTRODUCTION Since our inception in 2010, Arshya Engineers and fabrications pvt. Ltd. Has grown from modest beginning into a prominent name in metal fabrication. Our growth has been driven by an unwavering commitment to quality and reliability. We prioritize customer satisfaction and continually strive to exceed expectations. We specialize in manufacturing a wide range of high-quality products that meet national and international standards (ASME, BIS, DIN, TEMA, API, ISI, IBR). Our experience includes customizing item based on client specifications. We have built reputation fro excellence in shop fabricated equipments like Pressure Vessels, heat Exchangers, Deaerators, Aerofoils, Skids, IBR Pipe spools, Fittings and more using carbon steel, Stainless Steel and Alloy Steel materials. We provide tailored solution for EPC Contractors and multinational OEMs in industries such as Power, Steel, Chemicals, Defense, Fertilizer, Railways, Oil & Gas..

Scene 3 (1m 18s)

[Audio] Arshya Engineers and Fabrications Pvt.Ltd is an ASME U stamp approved workshop. It is also approved by Indian Boiler Regulation for manufacturing Boiler Components and Fittings. Our workshop is PED certified for manufacturing of Butt Weld Fittings and Flanges as well as pressure equipment. Apart from these Our manufacturing facility is ISO 9001, 14001 and 45001 certified. Termochimica Impianti based in Italy is our Design Collaborator for supply of Deaerators.

Scene 4 (1m 58s)

[Audio] Our Mission is to inspire innovation and provide exceptional solutions that create value for industry, society and the environment. We aim to set standard in metal fabrication through world class products, Teamwork and Creativity..

Scene 5 (2m 16s)

[Audio] By 2030, we aim to be recognized as the world’s most reliable, sustainable, and cost effective metal fabrication company. With Innovative practices that exceeds the highest levels of quality and efficiency. We aim to set a benchmark for excellence.

Scene 6 (2m 33s)

[Audio] At Arshya Engineers and Fabrications Pvt. Ltd. We are very cautious and committed to save our environment. 1.With our inbuilt Roof Top solar system we are able to produce 50% of our electricity consumption. 2. With our rain water harvesting system we are able to recharge 500000 gallons of water in every year. Environmental sustainability.

Scene 7 (2m 59s)

[Audio] Our total Area is 91800 Sq feet out of which 78000 Sq feet is covered Area. The core strength of our factory is our 160 well trained and qualified people. We have CNC Plasma and CNC Oxy cutting Facility available. 3 Nos Plate bending machine available up to 60 mm Thk and 2.5 Metre width. Our workshop is equipped with SAW, GTAW, SMAW and GMAW welding facility. 22 Nos motorized rotating equipments are helping us to increase the productivity. Our press shop is equipped with 6 nos of Press machine upto 800 T Capacity. For Heat treatment our workshop is equipped with Heat treatment furnace, Modular Furnace and Localised Heat Treatment facilities. 8 Nos Lathe machines are precisely doing their jobs for machining requiremets. For Drilling we have 2 nos.Radial Drill machine. The most beautiful part is that we have separate and distinguished Stainless Steel Fabrication Area. For lifting and material shifting the workshop is equipped with 10Nos Over head Cranes up to 25 MT capacity. Our Induction Heating Hot Forming Mandrel Elbow machine produces precise elbows faster with accuracy. We feel proud that we are the first manufacturer I India to devlop Reducing Elbow for Oil and Gas and HVAC. MANUFACTURING FACILITY.

Scene 8 (4m 30s)

[Audio] Inhouse Testing Facility DT UTM Bend Test Flattening Test NDT PMI Radiography Test Ultrasonic test Liquid Penetrant Test Magnetic particle Test Hardness Test Ultrasonic Thickness gauge.

Scene 9 (4m 50s)

[Audio] Year 2015 2016 2017 2018 2019 2020 2021 2022 2023 Turnover (Cr) 5 6 7.5 9 11 12 18 32 42.

Scene 10 (5m 13s)

[Audio] 2024-25 2023-24 2022-23 2021-22 2020-21 2019-20 0 0 0 0 0 0 2024-25 2023-24 2022-23 2021-22 2020-21 2019-20 3.97 8.8000000000000007 5.5 2.4 1.97 2.77.

Scene 11 (5m 57s)

[Audio] Automatic Press has been installed for End Casing and Water Box Dome Going to procure VMC machine for precise drilling of baffles. New Plant as an extension to existing Laser Machine for precise cutting of Nozzle holes and plates..

Scene 12 (6m 12s)

[Audio] . https://ci3.googleusercontent.com/mail-sig/AIorK4y2loI5bHuGcoIj850Fw_jAtIAPc9RG1UkvCix4YqJChyrj2xXRyQAAV-dOSWOCee3udO9ySwnmPc3V.