PPT_Elec and Low Voltage System and Lighting Device Installation_ENJP

Published on
Embed video
Share video
Ask about this video

Scene 1 (0s)

Electrical and Low-Voltage System & Lighting Device Installation.

Scene 2 (15s)

CORE SAFETY FRAMEWORK. Compliance with EM 385-1-1 & UFGS 103526 standards for rigorous site safety and hazard mitigation..

Scene 3 (28s)

DETERMINATION CRITERIA 判定基準. The Risk Assessment Code (RAC) is determined by mapping Probability (Frequent to Unlikely) against Severity (Catastrophic to Negligible)..

Scene 4 (1m 0s)

STEP 1: PERSONNEL TRAINING 関係者への安全教育・訓練. SITE-SPECIFIC READINESS 現場固有準備状況の確認.

Scene 5 (1m 29s)

HEAD 頭. ANSI Z89.1 Type I/II Class G or E mandatory at all times. ヘルメット: 常時着用必須.

Scene 6 (2m 5s)

Hard hat ヘルメット (ANSI Z 89). AMERICAN ENGINEERING.

Scene 7 (2m 37s)

資材取扱いおよび運搬管理. ステップ5&8:資機材移動. MATERIAL HANDLING LOGISTICS Job Step 5 & 8: Moving Assets Moving heavy equipment or Heavy construction materials identical musculoskeletal and crush hazards. . Mandatory Team Lifting for awkward loads • @ Surroundings awareness & path verification No materials moved above co-workers.

Scene 8 (3m 5s)

I. r. AMERICAN ENGINEERING c o R P o R A TION. 工具点検手順.

Scene 9 (3m 27s)

Hammer Drill & Anchor Setup ハンマードリル穿孔およびアンカー施工. AMERICAN ENGINEERING c o R P o R A TION.

Scene 10 (4m 4s)

Lock Out / Tag Out (LOTO) ロックアウト / タグアウト. Hazardous Energy.

Scene 11 (4m 19s)

AMERICAN ENGINEERING c o R P o R A TION. CONTROL OF HAZARDOUS ENERGY 危険エネルギーの管理.

Scene 12 (5m 3s)

AMERICAN ENGINEERING c o R P o R A TION. HEIGHTS & LADDER SAFETY.

Scene 13 (5m 47s)

AMERICAN ENGINEERING c o R P o R A TION. Risk & Control Distribution Strategy リスクおよび管理対策の配分戦略.

Scene 14 (5m 59s)

AMERICAN ENGINEERING c o R P o R A TION. Hazard Distribution Breakdown 危険要因の分類・内訳.

Scene 15 (6m 25s)

AMERICAN ENGINEERING c o R P o R A TION. Arc Flash & Electrocution.

Scene 16 (7m 42s)

Mitigation & Control Hierarchy リスク低減&管理対策のヒエラルキー(優先順位).

Scene 17 (7m 59s)

AMERICAN ENGINEERING c o R P o R A TION. LOTO. The "Locked and Tagged" standard is the non-negotiable barrier between safety and fatality. Zero Tolerance: Every circuit is considered live until proven otherwise. Rule: "If it's not Locked and Tagged, it's alive.".

Scene 18 (9m 22s)

Mitigation & Residual Risk 低減対策および残留リスク. Administrative 管理的対策.

Scene 19 (10m 6s)

Emergency Response Protocol IAI First Aid Immediate Actions Minimum 2 CPR-trained staff on site. Use PPE for Call 911/ 119 immediately. Ensure site address is blood-borne pathogens. Wash after body fluid visible. Use effective communication means. contact..

Scene 20 (10m 35s)

SAFETY FIRST. Mission Always. Questions?. American Engineering Corporation.