PML Transfer Process. Blue letters and text on a white background Description automatically generated.
PML means Primary manufacturing location We will get request from requestor to transfer those 30c, 30f, 30S, 30G IPCs..
PML transfer Process. The approval process of the creative center of origin for the requested IPC must be followed prior to setting the PML. FAD must review the flags in the product data screen in IFFMAN to ensure that the following flags are not set:.
Do Not Use / Archive flag. Transfer is not allowed.
If the transfer request is for 303/30F/30U IPC’s the request must be sent to Neuilly FAD, for further handling. FAD of the requestor’s site is responsible to gather the approvals from Trustee or CC Director for IPCs of all regions before proceeding with the formula transfer..
According to the (Exception Table) no approval from the Trustee or CC Director is required.
After trustee approval, add PML to the head formula . 2. After setting PML, make sure all the sub formulas transferred as well. Click ‘Exploded PML’ and see whether there’s ‘X’ for subs. If yes, highlight it and click ‘Grant’ button at the lower right corner..
After BOM migration check in PR1(ZBOMASSGN), FAD must reply to the requestor that the transfer was successful. If the requestor is from Neuilly and Neuilly FAD is already copied then always keep Neuilly FAD in copy on the email..
Thank you.