PowerPoint Presentation

1 of
Published on Video
Go to video
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Page 1 (0s)

NEW ELECTRICAL POWER GENERATION SYSTEM. Charles D Creancy Engineer / Inventor.

Page 2 (7s)

TABLE OF CONTENTS - 1. Climate changes overview Traditional Electrical Power Generation Oil Gas Solar Wind Coal Nuclear Hydropower Geothermal.

Page 3 (12s)

TABLE OF CONTENTS - 2. New Electrical Power Generation System Description Requirements Equipment’s Operation New Electrical Power Generation System Prototypes 1994 - Prototype 1994 - Prototype Use 1994 - Prototype Publication 1994 - Prototype Patente 2018 - Prototype 2018 - Prototype Pictures.

Page 4 (13s)

TABLE OF CONTENTS - 3. New Electrical Power Generation System Applications Goals Opportunities New Electrical Power Generation System Brief Summary of the Inventor Inventor’s contacts.

Page 5 (16s)

PR E AMBLE.

Page 6 (18s)

CLIMATE CHANGE. A picture containing resort, shore Description automatically generated.

Page 7 (19s)

TRADITIONAL ELECTRICAL POWER GENERATION.

Page 8 (20s)

- OIL -. A picture containing sky, outdoor, factory Description automatically generated.

Page 9 (21s)

- GAS -. A picture containing sky, outdoor, ground, blue Description automatically generated.

Page 10 (5m 14s)

- SOLAR -. A picture containing tree, outdoor, house, building Description automatically generated.

Page 11 (5m 41s)

- WIND -. Wind power is cost-effective. Wind creates jobs Wind enables industry growth and competitiveness. ... It's a clean fuel source. Wind is a domestic source of energy. It's sustainable. Wind turbines can be built on existing farms or ranches..

Page 12 (6m 11s)

- COAL -. A yellow car driving on a road Description automatically generated with low confidence.

Page 13 (6m 38s)

- NUCLEAR -. According to the NEA, identified uranium resources total 5.5 million metric tons, and an additional 10.5 million metric tons remain undiscovered—a roughly 230-year supply at today's consumption rate in total.

Page 14 (7m 5s)

- HYDROPOWER -. Hydropower provides benefits beyond electricity generation by providing flood control, irrigation support, and clean drinking water. Hydropower is affordable. Hydropower provides low-cost electricity and durability over time compared to other sources of energy..

Page 15 (7m 29s)

- GEOTHERMAL -. Environmentally Friendly.. Renewable. Huge Potential. Sustainable / Stable. Heating and Cooling. Reliable. No Fuel Required. Rapid Evolution..

Page 16 (7m 53s)

NEW ELECTRICAL POWER GENERATION SYSTEM.

Page 17 (8m 0s)

The NEW ELECTRICAL POWER GENERATION SYSTEM is a NEW POSSIBILITY of Electrical Power Generation..

Page 18 (8m 14s)

- REQUIREMENTS -. The NEW ELECTRICAL POWER GENERATION SYSTEM will NOT REQUIRED YOU TO BUILD A NEW POWER PLANT OR OTHER TYPE OF FACILITIES.

Page 19 (8m 29s)

- EQUIPMENT’S -. Alternating current generator : the power of the generator will be calculated to meet the need of the user ..

Page 20 (9m 2s)

- OPERATION -. State 1 :. Alternating current switchboard incoming breaker open Battery charger/rectifier incoming breaker closed Direct current switchboard incoming circuit breaker open Battery system circuit breaker closed Direct current drive motor circuit breaker open Direct current motor coupled to Alternating current generator.

Page 21 (9m 20s)

- OPERATION -. State 2 :. Alternating current switchboard incoming breaker open Battery charger/rectifier incoming breaker open Direct current switchboard incoming circuit breaker closed Battery system circuit breaker closed Direct current drive motor circuit breaker closed Direct current motor coupled to Alternating current generator.

Page 22 (9m 40s)

- OPERATION -. This state assume that through the Alternator produce AC energy . Driven by the DC motor, the Alternator produce the electrical energy which through the Switchboard incoming circuit breaker goes to the busbar, to the Battery charger switchboard incoming circuit breaker, to the DC drive motor and to the Battery system..

Page 23 (10m 6s)

THE NEW ELECTRICAL POWER GENERATION SYSTEM PROTOTYPES - PROTOTYPES -.

Page 24 (10m 13s)

- PROTOTYPE - 1994 -. The Prototype was built and use in a house in Philippines as a backup for the continuous brownout..

Page 25 (10m 48s)

- PROTOTYPE - 1994 -. This prototype was used as an emergency generator for a house and provided energy for the following equipment’s:.

Page 26 (11m 2s)

- PROTOTYPE PUBLICATION - 1994 -. MANILA B New electric power generator.

Page 27 (11m 10s)

1994 – PATENT APPLICATION. AND Ester Herrera Creaney Lot 2, block 2) Gov. Eusebio St. Indus-uy was 2 Applient: Es ter Herrera C reancy Creancy Electrical Pover Sys— Bankers Village II, Ta a, ca tocean C i ly: Attotmy'b Nw M•Uh.g Addre• Date Fied 10-25-93 ten 47131 (Fcr (hty) ACKIUW is herby of the the re.üred wm c«nsideed its as to the d.e•reof. tHs the APPLEANT. TITLE OF TIE INVENTION, DESIGN OR UTILITY "F. •.10 NUMBER, nd ute DATe OF Ht.1NG. and letters and ONLY TO: Of and Very . LOZ NOY Pat Examiner.

Page 28 (11m 34s)

- PROTOTYPE - 2018 -. THE ACTUAL PROTOTYPE IS SHOWN BY THE PICTURES HEREAFTER WAS ASSEMBLED IN A GARAGE.

Page 29 (11m 43s)

PROTOTYPE-02 - 2018 PICTURES.

Page 30 (11m 49s)

- PROTOTYPE – 02 -. Picture 02 – Front view. A picture containing text, indoor, table, cluttered Description automatically generated.

Page 31 (12m 0s)

Picture 03 – Control Left View. Picture 04 – Control Center View.

Page 32 (12m 10s)

Picture 05 – Control Center View. Picture 06 – Front View DC Control.

Page 33 (12m 20s)

Photo 07 – Vue Alternateur et Moteurs CC. Photo 08 – Vue Arrière.

Page 34 (12m 29s)

Picture 09 – Batteries Monitoring. Picture 10 – Back View General.

Page 35 (12m 39s)

Picture 11 – Back view Control and Batteries Charger.

Page 36 (12m 50s)

Picture 13 – Front view AC Meter Distribution. Picture 14 – Front view AC Meter DC System.

Page 37 (13m 1s)

Picture 15 – Front view Selector Switch. Picture 16 – Front view AC Meter Incoming and Selector Switch.

Page 38 (13m 12s)

Picture 17 – Back view Left. Picture 18– Back view Right.

Page 39 (13m 23s)

Picture 19 – Front view DC Control Meters. Picture 20– Front view DC Control Meters.

Page 40 (13m 36s)

NEW ELECTRICAL POWER GENERATION SYSTEMAPPLICATIONS, GOALS AND OPPORTUNITIES.

Page 41 (13m 43s)

- APPLICATIONS -. THE NEW ELECTRICAL POWER GENERATION SYSTEM HAS A WIDE RANGE OF APPLICATIONS:.

Page 42 (13m 56s)

- GOALS -. THE PRIMARY GOALS FOR THE NEW ELECTRICAL POWER GENERATION SYSTEM ARE:.

Page 43 (14m 9s)

- OPPORTUNITIES -. THE NEW ELECTRICAL POWER GENERATION SYSTEM IS:.

Page 44 (14m 23s)

NEW ELECTRICAL POWER GENERATION SYSTEM CHARLES D. CREANCY.

Page 45 (14m 30s)

Was born in a small village center of France He studied in French Military Academies He served in the French Navy After Graduating Electrical/Electromechanical Engineer he went to work on projects overseas for French Companies in Europe, Asia, Middle-East and Africa While working as a freelancer in Philippines he developed the New Electrical Power System to cope-up with the continuous brownout He moved with his Family to USA and Graduated from UCLA (University of California Los Angeles) Plant Engineering He has continued his work in overseas for US, Irish companies He has mastered the Electrical Power Monitoring System and Low and Medium Voltage electrical equipment’s maintenance He has retired in 2018 and developed the new prototype showed on the pictures 2018 Prototype..

Page 46 (15m 2s)

Email: [email protected] Twitter: @frusph01 Cellphone: +63-945-362-4317 Postal: Mr. Charles D. Creancy Lot 4, Block 4, Wheeler Street Royal Tagaytay Estate Subdv, Buck Estate Brgy Alphonso Cavite 4123 PHILIPPINES ISLANDS.