SRE Line Feeding Strategy

Published on
Scene 1 (0s)

Team - SCM

SRE Line Feeding Strategy

May-2021

Scene 2 (7s)

SRE Line Feeding Strategy- Discussion

Date

Title of the presentation on three lines - Lorem impsum dolor sit amet consectetuer adipiscing elit, sed diam nonummy

2

The purpose of this meeting is to align all internal stake holders towards line feeding strategy which is very essential in terms of adherence to TAT by easy and timely availability of PM/CM/CR Service Order parts to Maintenance lines.

Agenda:-

PM Service Order- Line Feeding Strategy : As per our PM maintenance strategy we have well advance PM Service Orders are available in System. Line Feeding of these Orders depend upon Material logistics Flow and PM Strategy ( 1M/3M/6M/9M & 12M ). The SO parts which belongs to Fl03 flow will be delivered to maintenance line through Kitting and Flo7 parts will be readily available through SMART BINS. CM Service Order- Line Feeding Strategy : In present scenario after Loco trouble shooting WH receives CM Service Orders. After receiving of CM SO, Warehouse immediately starts ling feeding ( TAT – 45 min ). In this case Kitting not possible . ( Conditional PM for material withdrawals are also come under CM Category ). CR Service Order- Line Feeding Strategy : In CR we have well advance SO available in System. In this case WH can do the Kitting and Line Feeding through trolley. SO Based Strategy :-

Scene 3 (58s)

Line Feeding at PRT Locations : -

Date

Title of the presentation on three lines - Lorem impsum dolor sit amet consectetuer adipiscing elit, sed diam nonummy

3

Apart from Saharanpur Depot, we have Prompt Response Team in field to attend the Loco breakdown/ failure on time. For these unscheduled tasks our PRT team carry some parts at respective PRT locations. Time to time these teams raise material requests for their location over email and based on that warehouse manage the delivery within Ten days of request received. Present List of PRT Locations in GSI : 0201- Mughalsarai ( UP ), 0202 Katni ( MP ) & 0203 Saharanpur Local.

Movement in GSI : - Against PRT request , Warehouse will run movt . 311 for transfer posting from Sloc – 0001 to Sloc – PRT Locations ( 0201 / 0202 / 0203 ) after consumption / installation of part concern engineer will close the Service order by passing movt . 261 and 262. The concern engineer/department will share the details of 262 movt . part to warehouse for further level of action like – Repair / RTV / Scraping etc

Scene 5 (1m 45s)

PM Service Order- Line Feeding Strategy

Date

Title of the presentation on three lines - Lorem impsum dolor sit amet consectetuer adipiscing elit, sed diam nonummy

5

3M PARIS 6M PARIS 0M PARIS IN PARIS FL03/ No Parts 3 Nos 1 No No Parts 15Næ FL07/ YvWRTBNS No Parts 10 Nos 11 Nos 19 Nos

Læsnsæo•v. R.D3) 1M 3M 6M 12M 1M No Part No Part No Part No Part No Part 3M NR.NKIT NR.NKIT NR.NKIT NR.NKIT 6M 6M.F1.D3hQT 6M.FID3RT 9M 12M INFI.NKIT

WH Kit Feeding & Top-up Plan:- 3M kit – 10 set - Always be available at Shop Floor 6M Kit – 5 Set - Always be available at Shop Floor 12M Kit- 3 Set - Always be available at Shop Floor

PM Kitting & Line Feding Flow FL07- 41 pats FLD3- 19pa-ts FL07 Oßration will Picked-up and nnsume SO Parts from SMART BINS I-xo Released FL03 Ktting at üne:- WH will run GSI Movt. - 311 from to ( shop floor ) After onsuming prts of Closir" taken care by through GSI - 261/262 for all FLD3 of - owl

Scene 6 (2m 18s)

CM Service Order- Line Feeding Strategy

Date

Title of the presentation on three lines - Lorem impsum dolor sit amet consectetuer adipiscing elit, sed diam nonummy

6

Present Scenario :- SO parts consumption booking are being carried out by WH through movt . 261/262 from Main Store Location – 0001.

Actual Process:- After receiving SO, WH will transfer SO parts from 0001 to 0801 ( shop floor location ) by movt . 311 and Operation should ensure consumption booking before closing of SO (goods movt . 261/262)

Scene 7 (2m 38s)

CR Service Order- Line Feeding Strategy

Date

Title of the presentation on three lines - Lorem impsum dolor sit amet consectetuer adipiscing elit, sed diam nonummy

7

Challenges:- WH team required Updated Weekly CR Plan in Advance for Kitting & Line Feeding.

Scene 8 (2m 49s)

Line Feeding at PRT Locations : -

Date

Title of the presentation on three lines - Lorem impsum dolor sit amet consectetuer adipiscing elit, sed diam nonummy

8

& IS Hrs I Hr Packing in 2 H Kitting in 12 Hrs TAT 10 Days PRT Centre Warehmaæ SRE FaulW Part 2 hrs 1 Hr & IS Hrs SRE GATE EMTR-,• — kea — 72 Ws REPAR/ RTV / scup

Scene 9 (3m 2s)

Present snaps of CR SO Kitting at Warehouse - Snaps of WH Kitting against CR Service Order. - Leble of Loco No, SO No, Part No and Qty clearly mentioned. 18:29

Date

Title of the presentation on three lines - Lorem impsum dolor sit amet consectetuer adipiscing elit, sed diam nonummy

9