L&T INNOVATION CAMPUS, MOUNT POONAMALLEE ROAD, MANAPAKKAM, CHENNAI - 600 087.

Scene 3 (19s)

Emergency Escape Route Area Overview Key Area Organizational chart Details of Property Utility Details HOTO Status KPI Employee Amenities.

Scene 4 (31s)

Square Night Glow Assembly Area Signage, For Industrial, Rs 200/piece | ID: 22475358473.

Scene 5 (56s)

ENTRY. Upcoming Towers & Area Overview :. T7. AM.

Scene 6 (1m 9s)

Tower 1 to Tower 10 Area Breakup:. Towers Car Parking Bike Parking FSI (SFT) Built-up Area (SFT) T1 746 1500 600412 573929 T2 747 1502 602099 573929 T3 - - 679890 645982 T4 - - 700192 666431 T5 - - 590,944 953,068 T6 - - 506,984 863,777 T7 - - 171,686 250,000 T8 - - 710913 1087649 T9 - - 786637 1163373 T10 - - 619979 996715 Amenity Building - - 68,890 117,113 Service apartment - - 111,407 189,392 Total 1,493 3,002 6,150,033 8,081,358.

Scene 7 (1m 36s)

INNOVATION CAMPUS COMMERCIAL PORTFOLIO 21 MILLION SQ.FT.

Scene 8 (1m 50s)

imil. iijiiijijiiii!'. A high angle view of a city Description automatically generated with low confidence.

Scene 9 (2m 0s)

A picture containing sky, outdoor, grass, scene Description automatically generated.

Scene 10 (2m 13s)

Key Area. A close-up of a logo Description automatically generated.

Scene 11 (2m 29s)

L&T Innovation Campus Chennai. Organization Chart – Tower 1,2,3,4.

Scene 12 (3m 49s)

A close-up of a logo Description automatically generated.

Scene 13 (4m 22s)

Sl.No. Enquiries Details 1 Transformers 4 nos. X 2500 KVA transformers (2 each for Tower1 & Tower2) 2 Power Backup 3 nos. X 2250 KVA DG sets & 1010 KVA X 1 no. DGs for Tower1 3 nos. X 2250 KVA DG sets & 1010 KVA X 1 no. DGs for Tower2 3 Chillers 3 nos. X 400 TR WCC & 3 nos. X 300 TR ACC for Tower1 3 nos. X 400 TR WCC & 3 nos. X 300 TR ACC for Tower2 4 Cooling towers 3 nos. X 400 TR cooling towers for Tower1 3 nos. X 400 TR cooling towers for Tower2 5 Lifts & Escalators Tower1 Passenger lifts - 8 nos. Jump lifts - 2 nos. Service lifts - 2 nos. Escalators - 2 nos. Tower2 Passenger lifts - 8 nos. Jump lifts - 2 nos. Service lifts - 2 nos. Escalators - 2 nos. 6 STP 600 KLD MBBR system 7 WTP 170 KLD 8 Water supply system Hydropneumatics water pumping system 9 Fire protection system External Hydrant, floor wet raisers, sprinkler & water curtain for basements 10 Fire alarm system smoke detectors, MCP, in all floors.

Scene 14 (5m 3s)

11 BMS system AHU controls, Power & utilities monitoring 12 HDS yard 50 KL X 2 nos. UG diesel tanks 13 Fire sumps Hydrant tank - 109 KL Sprinkler tank – 109KL Water curtain tank - 296KL 14 Raw water sump 170 KL 15 Treated water sump 170 KL 16 Overhead tanks Fire tank - 20 KL Domestic tank - 5 KL HVAC Makeup OHT - 60 KL 17 UPS 30KVAx2x2 Nos 18 Inverter 20KVAx2x2 Nos 19 Solar System 125KWx2 Nos (Only for Utility) 20 110kv GIS substation 50MVA Transformer – 2Nos , 110KVA C&R Panel , I/C – 2Nos , BC – 2 Nos , O/G – 13 Nos Feeders.

Scene 15 (5m 31s)

Area of Responsibility (All common area & its Equipment).

Scene 16 (5m 55s)

HOTO STATUS-Tower 1 & 2. A close-up of a logo Description automatically generated.

Scene 17 (7m 1s)

Planned Maintenance Ontime work Completion Maintenance Cost per Square Foot Legal & Statutory Compliance Energy Consumption Occupant Satisfaction Standard & Process Training & Learnings Initiatives & Innovations Safety.