INTERIOR & EXTERIOR HAVEN HEALTHCARE CLINIC – VILLA HAVEN RESORT DESIGN CONCEPTS CREATED NY JITHESH ARATTAYIL – PROJECT COORDINATOR VILLA CONSTRUCTIONS & PROJECTS PVT LTD.
DESIGN CONCEPTS FOR HAVEN HEALTH CARE PROJECT We developed a presentation that encompasses the entire Haven healthcare project design, with a separate technical section based on international guidelines and my past experience in similar projects. In it, I mention interior and exterior design concepts for 2D and 3D visualization, walkthrough video as per international guidelines (IHFG and UCDH), and provide general information..
Vasculer Cinic Vascular Lab.
HAVEN HEALTH CARE PROJECT Contents v GENERAL INFORMATION ABOUT PROJECT v 2D-INTITAL ARCHITETURAL / FLOOR / RCP / FIT-OUT LAYOUT (G+3 LEVEL) v BIM-LOD-300- REVIT – STRUCTURAL & ARCHITECHURAL (G+3 LEVEL) v 3D-EXTERIOR DAY & NIGHT (4 CONCEPTS ) v WALKTHROUGH-OUTDOOR VIDEO DAY& NIGHT v 3D-BIRDVIEW / INTERIOR / DEPARTMENTS CONCEPTS (G+3 LEVEL) v WALKTHROUGH-INTERIOR VIDEO (G+2 LEVEL) v TYPICAL HEALTHCARE POSITIVE AMBIENCE.
GENERAL INFORMATION ABOUT HEALTHCARE PROJECT (STAKEHOLDERS : ONWER /DESIGNERS/ CONSULTANTS / ENGINEERS/ CONTRACTORS /VENDORS/PROCUREMENT- AS A TEAM) OWNED BY VILLA GROUP DESIGNED BY VILLA CONSTRUCTION& PROJECT PVT LTD DEVELOPED BY VILLA CONSTRUCTION& PROJECT PVT LTD CONSTRUCTIONED BY VILLA CONSTRUCTION& PROJECT PVT LTD MEP DESIGN CONSULT BY QDC- QATAR RESPONSIBLE AUTHORITIES CHAIRMAN MR. QASIM IRAHIM D M D MR. ISMYAL SIYAN DIRECTOR (HEALTHCARE) MR.MUHAMED FARDHEEN PROJECT COORDINATED BY JITHESH ARATTAYILL.
GENERAL INFORMATION ABOUT HEALTHCARE PROJECT (STAKEHOLDERS : ONWER /DESIGNERS/ CONSULTANTS / ENGINEERS/ CONTRACTORS /VENDORS/PROCUREMENT- AS A TEAM) PROJECT HAVEN CLINIC (MULTI-SPECIALITY - HOSPITAL) PROJECT CODE VCP-HC/100-1/25-26 LOCATION VILLA HAVEN RESORT TERRITORY ATOLL – ADH-DHIFFUSHI COUNTRY MALDIVES STORY G+3 & ROOF SERVICES TOTAL AREA - PROJECT 13100 SQ.MTR STATUS OF PROJECT 1& 2 Phase structural activities ongoing -- (80% +30%) RCC SLAB LEVELS G- F = +4360MM / 1ST F = +4230MM /2ND F = +4200MM TIE BEAM LEVELS G- F = +3655MM / 1ST F = +3355MM /2ND F = +3780MM ABOVE MEP SERVICES - LTD G- F = 755MM / 1ST F = 655MM /2ND F = 870MM FALSE CEILING LEVELS G- F = +2900MM / 1ST F = +2700MM /2ND F = +2900MM PROJECT HAND OVER -OP DECEMBER-2026 ( OUR TARGET).
▪ International Health Facility Guidelines (IHFG) ▪ Facility Guidelines Institute (FGI) ▪ International Federation of Infection Control (IFIC) ▪ International Federation of Healthcare Engineering (IFHE) ▪ University of California Davis health (UCDH) ▪ World Health Organization (WHO) • FOCUS ON FOLLOWING UP WITH INTERNATIONAL GUIDELINES GENERAL INFORMATION ABOUT HEALTHCARE PROJECT.
BIM-LOD-300- REVIT – STRUCTURAL & ARCHITECHURAL (G+3 ).
• 2D-INTITAL ARCHITETURAL / FLOOR / RCP / FIT-OUT LAYOUT (G+3 ).
3D-EXTERIOR DAY & NIGHT (4 CONCEPTS ).
3D-BIRDVIEWS / INTERIOR / DEPARTMENTS CONCEPTS (G+3 ).
3D-BIRDVIEWS / INTERIOR / DEPARTMENTS CONCEPTS (G+3 ).
3D-BIRDVIEWS / INTERIOR / DEPARTMENTS CONCEPTS (G+3 ).
3D-BIRDVIEWS / INTERIOR / DEPARTMENTS CONCEPTS (G+3 ).
• 5-NOISE REDUCTION.
I have faith that the project tasks will be completed as a successful project and that God will bless us for completing them according to our wishes. JITHESH ARATTAYIL- PROJECT COORDINATOR +9607207285 /+919961156575 – [email protected] THANK YOU.