Golden Group for Industrial Systems

Published on Slideshow
Static slideshow
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Scene 1 (0s)

Golden Group for Industrial Systems.

Scene 2 (6s)

Company profile:. Our company (Golden Group for Industrial Systems) is an Egyptian organization established 1989 for serving the industrial field & utilities nationwide. Using our well – zoned branches and technical division which act to provide commissioning, startup, after-sales service …etc. Our main customers are: Oil & gas Petrochemicals Power generation plants Railway Water & waste water treatment Food and beverage Pharma.

Scene 3 (34s)

We add value. Technical Department Training Brand Representing Stock availability USA supply house Reverse engineering Customer orientation.

Scene 4 (43s)

Technical Department. Through our mechanical and electrical engineers , we study with our customer their technical problems to recommend the best solution using up to date technology. Also we do commissioning and start up for all the instrumentation we supply to our customers if needed. We do replacement on our responsibility..

Scene 5 (1m 1s)

Training. We do training for our Customers , Partners , Distributors. We also do training for our tech. and sales stuff to help them accumulating experience. We have a good tech. library (Soft & Hard) which can assist our customers , stuff in different fields..

Scene 6 (1m 18s)

Brands. We select very carefully the foreign companies that we represent in Egypt. Our focus always concentrate on the reputable companies from USA & EU. Samples for companies such as : Parker , Data Sensor , OMC , OMAL , Cassel …etc..

Scene 7 (1m 40s)

Stock availability. To serve our customer in convenient way to keep a strong stock from the most famous items , Like pneumatic components , photo cells , temp. controllers , control valves , field instruments, and so on..

Scene 8 (1m 56s)

USA supply house. American equipment’s American manufacturers spare parts Supply in local currency or foreign currency Small shipments is available Outside market survey Tech. support assistance.

Scene 9 (2m 10s)

Reverse engineering. Buffers Rails Bushes Air springs Ball joints Conical springs Shock mounts.

Scene 10 (2m 20s)

Reverse engineering. Rubber seals (NBR, EPDM, PTFE. etc.) Metal seals Diaphragms Lining materials Custom design seals.

Scene 11 (2m 30s)

Customer Orientation. We study with customer their tech. problems trying to find them the best solution according to their requirements. We use our strong relations in USA & EU to find the best way to solve problems and satisfy our customer needs..

Scene 12 (2m 46s)

Our activities:. FI (Field Instruments) PI (Panel Instruments) Pneumatics Valves Metal & Rubber products Seals USA Supply House.

Scene 13 (2m 56s)

FI (Field Instruments):. Pressure Transmitters Level Transmitters Flow Transmitters Temperature Transmitters Sensors (proximity, capacitive, metal detectors…etc.).

Scene 14 (3m 6s)

PI (Panel Instruments):. Temp. controllers & indicators Pressure controllers & indicators Level controller & indicators Flow computers Recorders Panel meters.

Scene 15 (3m 17s)

Pneumatics:. FRL’s Directional valves Cylinders & Actuators Tubes & Fittings.

Scene 16 (3m 26s)

Valves:. On / Off valves Solenoid valves Control valves Valves actuators Positioners & accessories.

Scene 17 (3m 36s)

Brands. [image] Logo. [image] Datalogic. [image] Image result for parker logo.

Scene 18 (3m 47s)

Brands. [image] Image result for leslie controls logo.

Scene 19 (3m 55s)

Some Applications.

Scene 20 (4m 1s)

A Typical Compressed Air Installation.

Scene 21 (4m 14s)

Egypt Alum. Replacement old huge fans by new ones Customer: Egypt Alum.

Scene 22 (4m 25s)

Egypt Alum. abstract. abstract. Replacement old huge fans by new ones.

Scene 23 (4m 36s)

Institute of Productivity Tenth of Ramadan. Training Kit for learning how the process goes: Flow – Pressure – Temp. – Level.

Scene 24 (4m 46s)

National Cement Company. Water spray system for dust suppression.

Scene 25 (4m 56s)

Halliburton. Design, Commissioning and start up for nitrogen generator 270 bar.

Scene 26 (5m 6s)

Grand Hayat Hotel. Design, commissioning and start up for air line 10 bar.