PowerPoint Presentation

Published on Slideshow
Static slideshow
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Scene 1 (0s)

SCHEFFLER Warehouse QHSE Overview.

Scene 2 (7s)

Warehouse Emergency Layout. Logo Description automatically generated.

Scene 3 (25s)

Quarantine/Rejection area Packing/Binning Area SPD Packing Area Packing/Binning Area SPD Packing Area OFFICE AREA Area for future expansion SECURITY ROOM Dock-7 Dock-8 Dock-9 Dock-10 Dock-4 Dock-5 Dock-6 Quality Inspection Quality Inspection AISLE-2 AISLE-2 AISLE-3 AISLE-3 AISLE-4 AISLE-5 AISLE-5 AISLE-6 AISLE-6 AISLE-7 AISLE-7 AISLE-8 AISLE-8 AISLE-9 AISLE-9 INBOUND AREA Bin area MHE CHARGING AREA SCRAP AREA AISLE-1 WH Entry Gate Empty bin area Restroom Office OUTBOUND AREA Car parking.

Scene 4 (56s)

Site overview. Warehouse Emergency handling.

Scene 5 (1m 10s)

Warehouse Site Overview. Logo Description automatically generated.

Scene 6 (1m 17s)

Site overview. Warehouse Internal View. A picture containing text, indoor Description automatically generated.

Scene 7 (1m 47s)

Site overview. Warehouse External View. Main gate.

Scene 8 (2m 24s)

QHSE Training. Logo Description automatically generated.

Scene 9 (2m 36s)

9. u Cam«a. A group of people in a room Description automatically generated with medium confidence.

Scene 10 (2m 50s)

06/11/2022. . A picture containing indoor ceiling person people Description automatically generated.

Scene 11 (3m 5s)

Warehouse 5S. 5S को एक व्यवस्थित कार्यस्थल बनाए रखने और अधिक सुसंगत परिचालन परिणाम प्राप्त करने के लिए दृश्य संकेतों का उपयोग करके उत्पादकता को अनुकूलित करते हुए कचरे को कम करने के लिए डिज़ाइन किया गया है। 5S पांच चरणों को संदर्भित करता है - sort, set in order, shine, standardize and sustain.

Scene 12 (3m 23s)

Lean Tools - 5S+1. 06/11/2022. 12. . . A picture containing indoor Description automatically generated.