Synergy Marine Group

Published on Slideshow
Static slideshow
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Scene 1 (0s)

A ship with pipes on the side Description automatically generated.

Scene 2 (6s)

Number of Ships 2006 2008 2010 2012 2014 2016 2018 2020 2023 YTD 4 12 20 50 116 145 206 315 488.

Scene 3 (12s)

3. 294 Tankers. 232 Bulk Carriers. 39 Containers.

Scene 4 (22s)

North America with solid fill. South America with solid fill.

Scene 5 (33s)

LNG. 5. Training infrastructure Synergy operates 3 training centres in India and the Phillipines.

Scene 6 (40s)

Project viability study Yard Selection Technical Specification and Contract Negotiation Equipment selection Plan Review and approval Attending Shop trials New Building supervision Sea Trial & Gas Trial FSU & FSRU Project conceptualization FSU & FSRU - basic & detailed design FSU & FSRU - EPC FSU/FSRU Operations Optimization.

Scene 7 (46s)

22 Tankers. Team’s Combined New Building and Conversion Experience.

Scene 8 (1m 1s)

1 x 155k LNG Carrier to FSRU Conversion @ Turkey 2 x 86k DF-VLGC (Dual Fuel LPG Carrier) @ HSHI, S. Korea 2 x 42 MMSCF OSV to FRU Conversion @ Turkey 1 x 91k VLGC (Conventional VLGC) @ HHI, S. Korea 2 x Very Large Ethane Carriers @ HHI, S. Korea.

Scene 9 (1m 7s)

LNG-based power plant FSU and FSRU for Southeast Asian country.

Scene 10 (1m 13s)

LNGC to FSU conversion. 10. JETTY FSU LEV TANK.

Scene 11 (1m 19s)

LNGC to FSU conversion. 11. JETTY NO.4 TANK FSU N0_3 LNGC NO.' TANK.

Scene 12 (1m 25s)

FSRU will be berthed alongside a Jetty to transfer natural gas to Powership. Gas demand from Powership is approx. 84mmscfd. FSRU is fitted with 4x21mmscfd Regas module. To meet future high demand of Powership, FSRU is also capable to send out LNG to a small barge-based FRU unit, which will further send NG to Powership. FSRU is fitted with 4 DG genset (3x11MW & 1x5.5MW), which will be running in FSRU mode to meet power demand of FSRU, and excess power will be sent out to Powership/PowerGrid.

Scene 13 (1m 32s)

r_ærrF-rrFFFÆr-rr--r er-r-rr-Frr-rr-r-rÆr— k' *diiäüäi'-' - '"Iiäiääiüiäi dää*iiääääi I_-iäääiüiäi.

Scene 14 (1m 38s)

14. Some of the time charterers of our vessels.

Scene 15 (1m 44s)

Karadeniz Holding | CakeResume. 15. Key clients who entrusted their vessels with Synergy.

Scene 16 (1m 50s)

16. Accelerating adoption of decarbonisation solutions – Long term.

Scene 17 (1m 56s)

17. Leaf with solid fill. Piggy Bank with solid fill.

Scene 18 (2m 3s)

YOUR ONE STOP TECHNICAL SOLUTION PROVIDER. Synergy Marine Group.