Email - Oksana Dobosh - Outlook

Published on Slideshow
Static slideshow
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Scene 1 (0s)

[Audio] Outlook Proposal Review From Tamara Lorde Date Fri 06/06/2025 10:20 To Oksana Dobosh Proposal Review 16 May 2025 15:29 Proposal review process Node 1 - Under Consultant Review Proposal Documents The first node is consultant review of proposal documents. In this node the consultants will have (depending on the contract) 7 days to review and cast a vote. The consultants' comments will be reviewed by the DM and will cast a vote. They will have the three voting options: Release for construction Rejected Yes proceed to DM Review - N/A Node 2 - Design Manager Review.

Scene 2 (31s)

[Audio] At this node, the Design Manager reviews drawings and cast a vote. They will have two voting options: Release for construction Proposal rejected The documents that are voted to release for construction will be required to be revised by the originator and uploaded with construction status. (include any comments if necessary) The rejected documents are required to be revised as next preliminary revision incorporating the comments from the consultants and DM) Created with OneNote..