PowerPoint Presentation

Published on Slideshow
Static slideshow
Download PDF version
Download PDF version
Embed video
Share video
Ask about this video

Scene 1 (0s)

DCIM. TeeCube Confidential - 2022. www.Tcubesol.com.

Scene 2 (8s)

Respond Faster to the Business Capacity Planning Maintain Availability Data Center Lower Costs DC Consolidation Cloud Computing.

Scene 3 (38s)

SECURITY IS A PRIME CONCERN. Group 1 1 Role Role 2 Role Role 1 2 Group 1.

Scene 4 (49s)

aove.w IGSp; 1 .20t9 1 o Last Check Next Check Stat. change Summary Output Cisco—CS S • Cisco—a Cisco—CZ SSC_G'O_ C S S O_Gi Cisco—CO Qce-c.ss-o UP (HARD - If 2) - 292..E.3.ec, 21-01-2019 21-01-2019 "-01-2029 Host i' up. Cont•in• 19 0K Sevices- C.Pu 6 14 14 running all -o.

Scene 5 (1m 35s)

ATHENTA 12 o 192 _ 168.3 PAC seö00 ( Lut state 21-01-2019 16:48:51) up 12'.C.C.L: Stat. S.V output PAC KW PA m PAC PAC_ PAC_Oe-Humi8ihe- PAC_ 21-01-2019 21-01-2019 03-01-2019 is 10 12.23 wc.

Scene 6 (2m 45s)

Maps Actions Drag Edit Map Create Reset Rack Options admin.

Scene 7 (3m 15s)

Provisioning of the Datacenter. TeeCube Confidential - 2022.

Scene 8 (3m 22s)

PROVISIONING: CHECKING FOR SPACE. Availablity Report ATHENTA Racks 3Dvew Network Configuration Objects AOMS Admil Console Racks Info Equipment Height (in U) Location Name Customer Athenta-DataCenter Customer-A 0.5 3-8 kWh Completely Empty R Submit Equipment Rated Load (kWh) Rack Load (kWh) Rack Type Reset.

Scene 9 (3m 34s)

search AOMS All Organizations Dashboard CMDB AOMS Assign - Team Agent - Error P Search for Incidents Incident 0 1-003705 1-003706 Provisioning Team Safi Ahmed Cancel General Information 1-003706 Qualification Request Management Work Order Request Management Incident Management Overview New Incident Search for Incidents Shortcuts Incidents Assigned to Me Escalated Incidents All Open Incidents Incident Work F low ATHEMA Organization Requester Status Origin Title Description • Athenta Sales Manager New phone 4 Dell-PowerEdge-2650 Servers @ 0.5kWh of 20 need to installed. 4 Dell-PowerEdge-2650 Sewers @ 0.5kV1/h of 20 need to be installed. Impact Urgency Priority Priority Overriding Justification High low low Relations Resolution SLA Report More Information Equipment Commissioning Private Log Public Log Contacts Dates start Date Last Update TTO Deadline 2019-01-21 14:30:02 2019-01-21 14:30:02 4 min.

Scene 10 (4m 15s)

MANAGING INVENTORY IS KEY. AOMS All Organizations v Dash board CMDB Overview co ntac ts -1 New Contact Search for co ntac ts Nev.' Search for CIS Dc•c u rnents Softw a r e Catalog Groups Of CIS so poocurnent Request Management Work O rder Request Manag emen t Incident Managemen t problem Management Change Data Ad m in istration ATH ENTA Overview IT Devices Create a New • Search for Server objects Storage System: 2 • Create a New System • for Storage System SAN Switch: 1 • Create a New SAN Switch • tor SAN Switch objects Chassis- Based Safety Devices: O • Create a New Safety Devu:es • Search for Safety Devices Network Switch. Security Devices: O • Create a New Security Devices • Search for Security Devices objects Firewall: O search KIOSK: O • Create a New KIOSK • Search for KIOSK objects • Create a New IP Camera • h for I p Camera objec ts Blade Server: I • Create a New Blade Server • for Blade objects SDH/PTN: O • Create a New Chassis-Based Network Switch for Chassis-based Nerwork Switch obFts • Create a Ne•w Firewall • for Firewall objects Printer: O create a New IP.pou • for ot*cts Load Balancer: O • Create a Ne•w Load Balancer • for Load Balancer objects Router: 1 • Create a New Router • Searc h for Router objects Non IT Devices • create a New SDHJPTN • Search for SDHJPTN objects create a New DG • h for DG objec ts UPS: 2 create a New ups • h for LJ PS objec ts pAS: I create a New PAS • h for PAS objec ts Power Connection: 4 • Create a New Power Connection • for Connectu.n ot*cts End user Devices PC: 1 Phone: O Phone: O Tablet.

Scene 11 (5m 5s)

DASHBOARDS. Real Time PUE Monitoring Cooling Requirernent (Rack Wise) Rack Wise — Load Analysis Heat Dissipation (Rack Wise).

Scene 12 (5m 15s)

GARTNER’S WORLDWIDE DCIM PRODUCTS ANALYSIS. Gartner peer insightsw FOR VENDORS Vendors (19) ANSYS N lyte Software AVEVA Sunbird Software Vertiv Athenta Corm ant View by Product Reviews 99 31 25 19 8 8 7 6 Overall -1 Rating 2 3 4 WRITE A REVIEW 5.

Scene 13 (5m 26s)

CASE STUIDES. NO 2. 4. S. 6. 7. Custorner location East African bank East African bank State Police organisation Of India Govt service Provider in one Of the larger states Of India One Of the largest Bank's DC in 'Odia Pvt One Of the largest Trans— port cornpany in International Airlines corn- pan-y Customer Challenges DC was frustrated •with lack Of interoperability Infrastruc- ture equiprnents and the IT equ•p— roents in his DC Since Last 3 years PUE was on the in— crease DC rnanager needed a holistic tool to rnanage Facility. Infrastructure and IT. Since they were dealing with a sepa— rate and Bb.•1S tool for the last 5 years. They had Sorne Open source to the JT equiprnent the racks- With lack of rack provisionang feature in the previous OCIM tool. It •vas get— ting difficu't for the DC rnanager and operators to serve the other govt depts adequately. who would seek the DC services Pl-JE was on the rise as the DC grew. Multiple dashboard to toanage rnutti— ple equiprnents in the DC. Old OCIM tool was rnore Of a "ability than a help resource They were seeking a new OCIM tool to urobrella manage their Datacenter. ventory in the datacenter had grown beyond any trace. Focus was also to rr•anage thear open source databases and few critical applicat•ons. T hey pre- viously had a Bb.•1S and a separate NMS tool have several datacenters in their country. Wanted one central location. •with distributed Challenges Athenta OCIM solved Athenta with its engine and unique platforrn solved this problern. Athenta shifting Of era' racks based on their heat dissipation. towards the PAC. which was on one side Of the wall. PUE started down. We solved their by setting up Athen- ta DCEYE to their need. The police applica- tio•ns which were never stable earlier. have stable for the last several Athenta DCEYE gave the custorner clarity on the space and utilisation per rack. The integrated provisioning roade it easy for the custon-•er. to around the 180 rack DC in no tiroe- Single window DCEYE roade it easy for the custorner and their operators to be in DC operations •mth the inbuitt •iden- tity and access roanagernent— in the tool roade jobs easier. with adequate security. 2 large Data Centers. with srnall Srnart DCs across the country becarne easy to rnanage. with Atheota•s distributed arche- tecture- Our integrated cyperations & roan- agernent systern. roade every inventory an identifiable objec:t. with its usabil'ty check at all instances. The cornr-non •enterpr•se ser vice bus- made the —Dependency rnanage- roent• and NON IT easier DC-OR frorn a single location easier- Dashboard tool. kept giving thern various dashtx•ards. including power and diesel usage across facilities.

Scene 14 (6m 33s)

Related image. CUSTOMERS AND PARTNER BASE. Image result for OMAN AIR LOGO.

Scene 15 (6m 53s)

Thanks. TeeCube Confidential - 2022.