[Audio] Unit-1, COH Meeting Date:13.03.26. Unit-1, COH Meeting.
[Audio] Unit-1, COH Observations PJB conducted at different locations.
[Audio] Unit-1, COH Observations(Night) Railing provided sir.. the electrical DB was being used without a valid inspection tag and the area was not barricaded. Biswash Engineering Location-U#1,TG 4th floor One worker was using a scaffolding working platform without an inspection tag. Biswash EngineeringLocation-U#1,TG-4th floor.
[Audio] Unit-1, COH Observations (Night) a worker was climbing in an unsafe manner near a visible deep opening. Proper access was not provided, and the worker was not wearing a full body harness while working at height. M/s Biswash Engineering Location-U#1,TG-4th floor lubricant drums were kept at multiple locations in unsafe manner which reflects poor housekeeping practices. U#1,TG-0mtr near -oil cooler 1B1.
[Audio] Unit-1, COH Observations The winch machine wire rope was in contact and rubbing against a pipe, creating friction during operation. New Engineering,U#1,ESP PASS-A TOP the rope pulley was being used without proper lubrication, creating noise during the operation. New Engineering Location-U#1,ESP-A PASS,TOP.
[Audio] The staircase walkway was slippery due to water spillage. This condition creates a risk of slip, trip, and fall for workers using the staircase. Biswaah Engineering,U#1,TG-4th floor One worker was engaged in cleaning work using high-pressure water without wearing gumboots and a waterproof jacket. NKPLOCATION-ESP-PASS-A O MTR.
[Audio] One worker was engaged in duct removing work while standing on the edge of the railing in an unsafe manner. U#1,TG-4th floor Confined space opening with the door open and internal light visible is their but Not barricade. APH duct entry in 14 MTR area, DIVAKAR.
[Audio] An electrical cable has been passed through the gap between the stair steps. U#1 ESP 1 PASS A. New Engg. Found oxygen cylinder stored near the electrical panel at Boiler 14.6 MTR, burner-3. BM,#1 boiler 14 .6 MTR burner 3..
[Audio] Found workers engaged inside the boiler at Pass-1 area, but no hole watcher was present at the site. BM Engg. #1 boiler 32 MTR Hot work is being performed without a fire watcher at the work location. BM Engg,SEAL AIR FAN.
[Audio] The wire rope of the winch machine is damaged at multiple locations. Despite this condition, lifting activities were being carried out using the same rope. U#1 ESP 1PASS A,NEW ENGG Material bag is placed on the scaffolding platform without proper securing, which may fall from height and create a falling object hazard. NEW ENGINEERING WORKS,ESP#01 inlet.
[Audio] Platform required inside the duct line at FD Fan1-A. M/ s B.M engg Welding cable found lying in water at the work location. BM,Mill.
[Audio] DA cylinder found placed on the floor without proper securing at the work location. DEVAKAR,PA FAN.
[Audio] Oxygen cylinder is being shifted manually at the work location. DEVAKAR,FD FAN 1B Worker is standing or moving under a suspended load during lifting activity. DEVAKAR,PA FAN 1A.
[Audio] From tomorrow loose cladding are there.at10.2 mtr boiler.pls. remove on priority basis Huge quantities of dust deposited on the roof of site store at firing floor.GI ROOF MAY collapse..
[Audio] Multiple lapses in the erected scaffolding A standard was not erected/ touched the ground. Ledger of the scaffolding to be projected minimum 6 inches outward. No kicker lift was fixed to the erected scaffolding. Bracing was not tightly fixed to the scaffolding. M/s P C K singh Walkway blocked by scrap materials, APH,Geeco clear the walkway.
[Audio] During gas cutting activity at height sparks and hot metal slag were observed directly falling from the upper level to the ground zero level where gas cutting cylinders were kept. Zero level area,M/s BM Compressed gas cylinders were improperly tied.Agency- M/s Divakar Location - PA fan 1C.
[Audio] Danger tap should be while working is not carried out.LHS dust Chain block is used for pulling off instead of hook chook. APH floor, M/s Divakar.
[Audio] Without Inspection of Winch machine is being used. Not following safety Norms by agency. U#1 PA FAN 1 Agency -DIVAKAR One lifting lug/eye plate has been welded to the beam for material lifting and shifting. U#1 APH AREA 17.5 MTRAGENCY -DIVAKAR.
[Audio] Person walking above the beam without anchoring.Agency- Qlar Location -above PA fan 1C Pulley was supported with hand railing at unit-2 bunker for eco coil removal.BM Engg.
[Audio] Make sitting arrangement was made for performing welding work at height.Person kept platform jali and kept one empty drum for welding work.Agency - M/s Divakar Location- APH.
[Audio] THANK YOU Gratings cut at APH AREA.Some Gratings at APH platform have been bent.Befire giving the load on gratings.it should be checked or replaced.