[Audio] Santo Tomas National High School Contingency Plan for School Year 2021 to 2022

Contingency Plan 2021 -2022

Nice PowerPoint Backgrounds for Presentations (Page 1) - Line.17QQ.com

Santo Tomas National High School Contingency Plan For School Year 2021 to 2022

Scene 2 (13s)

[Audio] The STNHS Contingency Plan was presented on May 6, 2021, at STNHS TechVoc Bldg. Attended by 24 individuals, 3 SSG, 1 SGC, 2 PTA, and 18 SDRRM.

The STNHS Contingency Plan Presentation

Date of Presentation: May 6, 2021 Place of Presentation: STNHS TechVoc Bldg. Total Number of Attendees: 24 Composition: 3 SSG 1 SGC 2 PTA 18 SDRRM

Scene 3 (32s)

[Audio] The STNHS Contingency Plan Presentation Attendance

The STNHS Contingency Plan Presentation Attendance

STNHS SDDRMC CONTINGENCY PLAN (2021 -2022), AND SDRRMC ACCOMPLISHMENTS PRESENTATION & REVIEW May 6, 2021 , at Tomas National High School, Tech Voc Bldg. ATTENDANCE Position Signature I._3V

Scene 4 (47s)

[Audio] The STNHS Contingency Plan Presentation Picture

The STNHS Contingency Plan Presentation Picture

STNHS CONTINGENCY PLAN 2021 -2022 Barangay Sto. Tomas Central, Baguio City

Scene 5 (57s)

[Audio] The STNHS Contingency Plan Table of Contents

The Table of Contents

Scene 6 (1m 5s)

[Audio] Background, The Baguio City Demographics and Economy

Background, Baguio City

*Kilt I CiW Gwarmai of Bmtio i«A-bæuo-ciW

Bmuio a:mw-rw noutN1irp I Philip'ine Ne&s Aqerrv aficles

Scene 7 (1m 16s)

[Audio] The City Poverty Index, Geophysical, climate, rivers, mountain, and topography

t«uio ciW — Crye cryec•.k 'if

Scene 8 (1m 24s)

[Audio] The city's elevation and mountain soil

"Baguio City is geographically located in the south central part of Bengue Province in the. Cordillera Elevation ranges from 900 meters along the Bued River to 1,600 meters at Pacdal. BLACK MOUNTAIN QUARTZ DIORITE PORPHYRY Loam, which incidentally is the second largest soil group in southern Ben uet." Source: II GEO. PHYSICAL ENVIRONMENT • City ww.baguio.gov.ph, sites , files, downloadable forms

Scene 9 (1m 47s)

[Audio] The Santo Tomas Central, Historical Note, and Topography

Background, The Santo Tomas Central

Scene 10 (1m 55s)

[Audio] The STC, Demographics

Scene 11 (2m 2s)

[Audio] The STC, Location

Middle Quezon Luts W 'age Tad •angan

Scene 12 (2m 23s)

[Audio] The STC, Economy, Poverty Index

Scene 13 (2m 30s)

[Audio] The STC, Geophysical such as climate, rivers, and mountain

Scene 14 (2m 38s)

[Audio] Background-STNHS. The Baseline Data on Learners and Personnel for school year 2019- 2020 is based from the Enhanced Basic Education Information System ( EBEIS). Data on School Building and Classrooms is in accordance with the National School Building Inventory NSBI.

Background, Santo Tomas National High School The Baseline Data on Learners and Personnel for school year 2019-2020 is based from the Enhanced Basic Education Information System (EBEIS) Data on School Building and Classrooms is in accordance with the National School Building Inventory NSBI.

Scene 15 (3m 1s)

[Audio] This 2021 to 2022 Contingency Plan covers STNHS with school IDs 305270 for Junior High School and 340054 for Senior High, in the Baguio City Division of Department of Education in Cordillera Administrative Region of the Philippines. It focuses on the Natural Earthquake and Fire Hazards and its Impact Hazards such as Heavy Rainfall and School ground Soil Erosion/ School Structural Collapse. Objective of the Contingency Plan. The objective is to prepare the School and its constituents for Natural Fire and Earthquake Hazards and their respective immediate Hazards such as School Ground Soil Erosion / School Structural Collapse that could be Man-Made Hazards due to sub-standard structural flows.

II. The Objectives

This 2021 to 2022 Contingency Plan covers Santo Tomas National High School with school IDs 305270 for Junior High School and 340054 for Senior High, in the Baguio City Division of Department of Education in Cordillera Administrative Region of the Philippines. It focuses on the Natural Earthquake and Fire Hazards and its Impact Hazards such as Heavy Rainfall and School ground Soil Erosion/ School Structural Collapse.

Objective of the Contingency Plan The objective is to prepare the School and its constituents for Natural Fire and Earthquake Hazards and their respective immediate Hazards such as School Ground Soil Erosion / School Structural Collapse that could be Man-Made Hazards due to sub-standard structural flows.

Scene 16 (3m 51s)

[Audio] The STNHS identified Hazards are: rainfall, typhoon, erosion, collapse, earthquake and fire

Scene 17 (4m 2s)

[Audio] STNHS Historical data on Disaster and its Impacts

Scene 18 (4m 8s)

[Audio] The STNHS Capacities and Vulnerabilities and Key DRRM Measures

Scene 19 (4m 16s)

[Audio] The low lying area of the school is susceptible to erosion. While substandard building structures of the building is prone to collapse. These happen during rainy or typhoon days. Mitigation happens with the strong support of the PTA and Partners thru the spirit of Brigada. MOOE, City fund and partners' donation and even the 10 percent back job of the newly built building provide the budget in the implementation of the needed repairs.

The low lying area of the school is susceptible to erosion. While substandard building structures of the building is prone to collapse. These happen during rainy or typhoon days. Mitigation happens with the strong support of the PTA and Partners thru the spirit of Brigada . MOOE, City fund and partners' donation and even the 10 percent back job of the newly built building provide the budget in the implementation of the needed repairs.

Scene 20 (4m 48s)

[Audio] The STNHS Anatomy of Earthquake and Fire Hazards

Scene 22 (5m 1s)

[Audio] The STNHS Resource Mapping and Planning

Scene 23 (5m 8s)

[Audio] The STNHS Inventory of Supplies and Equipment

Scene 24 (5m 14s)

[Audio] The STNHS Response Actions

Scene 25 (5m 21s)

[Audio] Response action for Hydro Meteorological Hazard

Scene 26 (5m 27s)

[Audio] The School DRRM Team

XIII. Table 8: School DRRM Team

Scene 27 (5m 36s)

[Audio] The STNHS Mapping of Implementing Partners

IX. Mapping of Implementing Partners

Scene 28 (5m 44s)

[Audio] May we ask your acceptance on our Contingency Plan for the School Year 2021 to 2022 by way of hand raising

May we ask your acceptance on our Contingency Plan for the School Year 2021 to 2022 by way of hand raising

Scene 29 (5m 55s)

[Audio] Thank you

TIHANK you!