Common Data Environment (CDE) 綜合數碼共用平台.
CDE是一個雲端空間,建築項目的資訊都儲存在這裡,並且對可供項目參與者存取。 這種存取權限取決於參與者的需求或授權級別,以及他們的合約義務。.
為何需要綜合數碼共用平台概念. 綜合數碼共用平台. CDE 是一項支持建築業採用 BIM 的重要資訊技術 (IT) 基礎設施。 BIM的採用自 2018 年起已被發展局 (DEVB) 的資本工程項目強制實行,適用於估計金額超過3,000 萬元的項目。 CDE 是一種數位解決方案,用於管理和儲存任何給定項目或資產的專案訊息,可促進項目各方之間的 BIM 協作工作。.
CDE的基本條件. 綜合數碼共用平台. 符合 ISO 19650 標準. Increasing benefit from existing and new digitally supported and enabled processes Federated information models Structured data Unstructured data File/Model/Container and information management technology based common data environment (CDE) Object based server information models Federated information models Structured data Unstructured (BIG) data uery(Model/Ccntainer/ database and information management technology based CDE Process standards to be developed Stage 3 Business layer Information layer Technology layer Standards layer National standards Stage 1 Regional!National annexes ISO 19650-1 and ISO 19650-2 Stage 2.
CDE的基本條件. 綜合數碼共用平台. CDE的三大組成部分. 電子文件管理 工作流程管理 2D 和 3D 協調流程.
CDE的基本條件. 綜合數碼共用平台. 電子文件管理(EDMS) Cloud options Data storage Data backup Data security Anti-Virus Document archive Document management Access security Access options 工作流程管理 For a specific project or built asset, it is used for single, multiple project stages or full project lifecycle of the built asset. Typically, a Project Information Model (PIM) CDE or Asset Information Model (AIM) Workflow for Managing Information process Workflow for document submission and approval Dashboard & Reporting Audit Trail 2D 和 3D 協調流程 3D viewer 2D viewer Document viewer Issue tracking.
CDE的基本條件. 綜合數碼共用平台. Internal & external project team member Client Consultant Pre-construction Contractor Design Sub Contractor Maintenance Facilities Manager Services Manager Construction IT Department Handover Facilities Management.
INFORMATION MODELS PROJECT INFORMATION MODEL COMMON DATA ENVIRONMENT ASSET INFORMATION MODEL Graphical an 101 Non Graphical Associated documents CAD Drawings Models Schedules Specification Manual Warranty FILE TYPES DWG PDF IFC w JPEG.
CDE的解決方案及工作流程. 綜合數碼共用平台. 文件管理 項目資料一致性 BIM項目協作 工作流程管理 檢查和清單 報告以及見解 移交給甲方作維護管理.
CDE安全管理. 綜合數碼共用平台. 項目資訊必須存放在安全的 CDE 中。 專案使用者應透過兩步驟驗證支援和安全斷言標記語言 (SAML) 進行安全訪問,以便與 SSO 提供者整合。 建築 CDE 是基於雲端的,其中儲存了建築項目的信息, 項目參與者可以根據他們的要求/授權級別進行訪問。.
CDE安全管理. 綜合數碼共用平台. 為不同使用者分配存取權限,維護資訊安全.
為什麼採用 CDE. 綜合數碼共用平台. 加強協作 單一項目資訊來源 提高效率和品質 安全 方便使用 無障礙 融合的 標準化和可擴展.
CDE的管理. 綜合數碼共用平台. 符合ISO 19650和CIC BIM標準V2.1. ISO IransrninalG ISS "c nbcrs Setlinas 19650 Naming Standard Default • ISO Default - 19650 Ttys uses the document attributes: and apps xxxxxx.xxx-zz-Z2-LF-A-ttrtttHtt Naming c O mntiOn project originator Related attributes Status volume/system Level/lÄation Nurnbe- thc naming standard cant though it can bc thc applic•d tocan Occhanqcd_ Cancel Avvly.
CDE的管理. 綜合數碼共用平台. 符合ISO 19650和CIC BIM標準之流程示意圖. ARCHIVED Archived info to enable the ongönc operation and maintenance Of the asset. and an audit trail of information developmalt 11) Archival SHARED Verified read-only info. shared with other task teams for coordination and/or with the appointing party WORK IN PROGRESS Editable information being developed by its task team, not visible by Others 1) Verify 2) Generate 3) Coordinate Task team A Task team B Task team WIP TO SHARED Information undergoes a QA check and technical review to approve for sharing 4) Check 5) Review 6) Approve path' PUBLISHED Autmrised read-only info. accepted as a deliverable by the appointing party Publishing oæurs for each information nlestone SHARED TO PUBLISHED Info. model is reviewed by lead appented party, then again by appointing party in accordance with the EIRs. 7) Review 8) Authorise 9) Review 10) Accept party party.
CDE的管理. 綜合數碼共用平台. 透過Power BI建立儀表板來分析CDE的使用情況. Graphical user interface, chart Description automatically generated.
CDE上文件檔案的修訂管理. POLOI POQ.OI P03.01 POI.02 POQ.02 POI .03 POI.04 POI .05 Decision fo change / develop futher POQ.03 POQ POI Shored Decision to change / develop futher P03.0Q P03 Shared for non-contractucl purpose e.g. for comment Shared Shared for non-contractual purpose e.g. for comment Authorized and accepted COI Published for contractual purpose e.g. for stage Q purposes (A2) Shared Shared for non-contractual purpose Norn-Published/ Preliminary Information Published/Contracfual : Information :.
CDE上文件資訊性質狀態 示意圖. LA.4.2 Status Then following Status codes for information containers within a common data environment shall be used: so Suitability Initial status or WIP Description Initial state Of all information in the WIP to indicate it is editable and only accessible by the authorin Task Team For the Common Data Environment 'Shared' section S2 S3 S4 S5 S6 Shared for Co- ordination _ Shared for Informatlon Shared for Lead Consultant/ Contractor Review, Comment Shared for Lead Consultant/ Contractor Review, Comment and Authorisation Shared for Appointing Party I Client Review, Comment and Accept Shared for PIM Stage Authorisation Available to be 'shared' and used by other disciplines as a background for their information. Available to show current progress. Self. checked, reviewed and approved by authoring team Available for design review and requires comment from the Design Lead. Available to be Shared after design review, comment, and approval by Lead Consultant/ Lead Contractor. This is likely to be used where revisions include versions requiring decisions on which option should be taken forward. Available for Appointing Party / Client Shared after design review and approval, prior to Appointing Party / Client review and acceptance. Identified as suitable for stage milestone delivery x.
Markup IZI Name P1047-CWC-dLD-OO-AR-M3.rvt P1047-CWC-BLD-01-AR-M3.rvt P1047-CWC-BLD-02-AR-M3.rvt P1047-CWC-BLD-03-AR-M3.rvt P1047-CWC-dLD-04-AR-M3.rvt P1047-CWC-BLD-05-AR-M3.rvt P1047-CWC-BLD-RF-AR-M3.rvt P1047-CWC-BLD-ZZ-XX-M3.rvt P1047-CWC-ZZ-GRD-AR-M3.rvt Description GF ARC Model IF ARC Model 2F ARC Model 3F ARC Model 4F ARC Model 5F ARC Model RF ARC Model Master View Model Master Grid Model Version v114 V103 V98 V93 V82 V96 V83 V25 Size 447.1 MB ISIL MB 133.4 MB 777 MB 60.5 MB 163.8 MB 70.2 MB 2.3 GB 1.8 MB Last updated Jun 14, 2024 5:27 PM Jun 14, 2024 5:58 PM Jun 14, 2024 5:30 PM Jun 14, 2024 5:17 PM Jun 14, 2024 516 PM Jun 14, 2024 5:30 PM Jun 14, 2024 5:28 PM Mar 28, 2024 3:40 PM Mar 28, 2024 3:02 PM Updated by Louis Yan John Ng Louis Yan Louis Yan Louis Yan Louis Yan Louis Yan Alden Chin Alden Chin Issue Review status Set Revision POI-14 POI-14 POI.13 POI.13 POI-12 POI-12 POI.IO POI.OI POI.06 Status Code so so so so so so so so so.
BIM模型管理. BIM Master Model Architectural HVAC Building Services Fire Services Plumbing & Drainage Underground Utilities Electrical Structural Super Structure Foundation Site Formation.
原生 BIM 模型 匯出為 IFC 檔案格式 上傳至CDE平台 審核/批准/分享. BIM模型管理.
透過 CDE 進行協作. 綜合數碼共用平台.
undefined. 透過 CDE 進行協作.
自動衝突偵測. Clashes ssL513-cwc- -1301 ssL513-cuc-8LD-03-5T-M3„-vt - 580 Basic 13170481 clash m Basic with Basic 13181331 with Basic 131813.1 Basic IJIg60g1 Basic with Basic 135877B] Basic 13663761 Basic 13665431 gasic 1 lituititiiil\jifIifiid-tL It.
undefined. 自動衝突偵測.
基於模型的工程量估算. 2 motels Model Filters filteß Model Tree Elit Nsic ssL513-cwc-dLo-OY-ST-W1,-vt - 130} 55LS13-cwc-aLo-02-5T-M3.M - e Default SCL-RCL scu-RCL -CWC-R«tangula 51 21 800. 80, scL.RCL-cwc : goo : 800mm 000.